My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00190
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00190
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:11 AM
Creation date
10/5/2006 11:42:42 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153324
Contractor Name
Breckenridge, Town of
Water District
0
County
Summit
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />------------------- <br /> <br />TABLE II - 6 <br /> <br />ULTIMATE WATER USE REQUIREMENTS <br /> <br /> AVERAGE AVERAGE PEAK AVERAGE YEARLY USE <br />AREA UN ITS DAY/UNIT DAY USE DAY USE ~,1. G. C.F :S. G.P.M. <br /> (gpd) (g) (g) <br />Warrior's Mark 699 350 244,600 366,900 89.298 .3786 169.9 <br />Peak Seven 741 350 259,350 389,025 94.663 .4013 180.1 <br />Silver Shekel 245 350 85,750 128,625 31.299 .1328 59.6 <br />Sorgel 58 350 20,300 30,450 7.410 .0313 14.1 <br />TOTAL 1743 350 610,000 915,000 222.670 0.9440 423.7 <br /> <br />Peak Seven <br />System1 <br /> <br />1044 <br /> <br />350 <br /> <br />365,400 <br /> <br />548,100 <br /> <br />133.372 <br /> <br />0.5654 <br /> <br />253.8 <br /> <br />lCombination of Peak Seven, Silver Shekel and Sorgel . <br /> <br />~ <br />~ <br />I <br />~ <br />N <br /> <br />g <br />gpd <br />M.G. <br />C.F.S. <br />G.P.M, <br /> <br />= gallons <br />= gallons per day <br />= Million Gallons <br />= Cubic Feet per Second <br />= Gallons Per Minute <br />
The URL can be used to link to this page
Your browser does not support the video tag.