Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />fl. Peak SevenSys tem <br /> 1- Water Treatment Plant, 400 gpm <br /> 2. Upper Slope pump station <br /> 3. Peak Seven 500,000 gallon storage reservoir <br /> 4. Upper Slope 150,000 gallon storage reservoir <br /> 5. Water distribution and transmission lines <br /> 6. Pressure reducing stations <br /> <br />C. Peak Seven - Silver Shekel tie <br />1. Transmission lines <br />2. Pressure reducing stations <br />3. Altitude valve,'Silver Shekel tank <br /> <br />D. Water metering program <br /> <br />The costs of the construction program i~ $2,395,000 in 1981 dollars. <br />These costs are shown in Section IX of this report. <br /> <br />Because of the rapidly expanding area and the need for immediate im- <br />provements in water quality and water storage, all capital improvements <br />are designed to serve the District thru ultimate buildout within the <br />existing boundaries of the District. <br /> <br />The current water customer of the District pays $15.00 per month <br />in the Peak 7 and Silver Shekel areas and $17.50 per month in the <br />Warriors Mark area. It is expected that these rates will not have <br />to be increased with total tap fees in the amount of $3,175 will be <br />used to finance the proposed construction program. A growth rate of <br />8% per year is required to generate funds from tap fees. The growth <br />rate for the past 10 years has been 12% with all indications that this <br />rate will be higher for the next 10 years. <br /> <br />xviii <br />