Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The major recommendation for the District to show direction in the <br />construction plan are as follows: <br />1. Combine the three existing water supply systems in the Peak <br />Seven area into one new system. All three systems are <br />marginal to poor in the water produced with the Upper <br />Slope system originally constructed as a temporary system. <br />2. Construct necessary storage facilities to comply with fire <br />flow and water usage requirements. The existing storage <br />capacities are very inadequate. <br />3. Initiate and conclude a metering program as the best device <br />available to conserve water and improve on equitable payments <br />from the customer. <br />4. Perfect the District's conditional water rights and pursue the <br />acquisition of senior water rights thru an augumentation plan <br />t~retire the District's consumption use water to protect <br />the District's junior water rights from call by other senior <br />rights holders. <br /> <br />There are other minor recommendations made in each section of the <br />report and the Master Facilities Plan. <br /> <br />To follow through on the recommendations, the following items should <br />be constructed: <br />A. Warrior's Mark System <br />1. 500,000 gallon storage reservoir <br />2. Warrior's Mark pump station <br /> <br />xvii <br />