My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00185
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:11 AM
Creation date
10/5/2006 11:42:24 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0002X
Contractor Name
Boone, Town of
Contract Type
Loan
Water District
0
County
Pueblo
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I" <br />I I <br /> <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />"I. <br /> <br />The small diameter lines create low pressure problems <br />during peak flow periods and fire flow demands. Many of <br />the existing water mains are not looped and thus contri- <br />bute to the pressure problems. In addition, the existing <br />fire hydrant installations do not meet with the recommen- <br />dations of the National Board of Fire Underwriters and <br />state requirements. It is noted that adequate fire pro- <br />tection cannot be provided to the existing elementary <br />school and other public buildings. <br /> <br />Boone has a volunteer fire department. Recently, Boone <br />acquired a new pumper truck and is planning to purchase <br />a tank truck for fighting rural and brush fires. At this <br />time the pumper truck is not effective due to the deficien- <br />cy in the distribution system and lack of fire hydrants. <br /> <br />Funding for constructioh of the 1980 water system facili- <br />ties was provided by the Department of Housing and Urban <br />Development (H.U.D.) and in part by revenue sharing funds. <br /> <br />4. PROPOSED WATER SYSTEM FACILITIES <br /> <br />A. Water Supply <br /> <br />No additional improvements to the water supply facilities <br /> <br />are recommended at this time. However, due to the fact <br /> <br />that bids for the construction of the new pumping facili- <br /> <br />ty were in excess of the engineering estimate, insufficient <br /> <br />funds were available to complete the facility. Approximate- <br /> <br />ly $12,000 are still required for the installation of the <br /> <br />new gas chlorination equipment and liquid level control <br /> <br />telemetering equipment between the pump facility and the <br />200,000 gallon reservoir. This cost will be addressed <br />further in the financial section of this report. <br /> <br />-6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.