Laserfiche WebLink
<br />. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />requirements. To do so requires that already inadequate <br />facilities be operated unattended. <br /> <br />The project proposes to replace the existing pressure <br /> <br /> <br />filters and wood stave raw water transmission line and replace <br /> <br /> <br />these with new facilities. <br /> <br />The project proposes to provide new backwash facilities and <br />chlorine contact time prior to first domestic user, there are <br />no present facilities ,for both of these functions. <br /> <br />Replace existing chemical feeders with new units. <br /> <br />Modify existing clarifier and pumping facilities. <br /> <br />Provide additional treated water storage facilities. <br />The report projects anticipated population growth within <br />the Town of Hayden due to recreational and enegry developments <br />expected to occur within the near future. <br /> <br />Based on present consumptive usage of water and projected <br />population growths, estimated water usage requirements and <br />water system facilities necessary to satisfy these needs, <br />within Federal and State Standards, were thence determined. <br /> <br />Since the rate at which growth actually occurs will <br />differ from that projected, the project facilities have beeri <br />phased to provide sufficient flexibility to allow for a feas- <br />ible fiscal program to be established to accomodate expansion <br />and growth. <br /> <br />These programs are set forth in the report. <br /> <br />T - 9 <br />