Laserfiche WebLink
<br />, , <br /> <br />. <br /> <br />. <br />" <br />r <br /> <br />ATTACHHENT A <br /> <br /><P <br /> <br />~:~U~:~~E~:L;~r~ 202~:::~:O~C:e:~3~3' ~~!flJ <br />!l rc , t Ii) i <br />SCP J~ Y It I!!/ <br /> <br /> <br />" cOlo:" :/.981 <br /> <br />c.,..,,,...._, ",-jDo t <br />";':':,'7l'47- :::>--, <br />IIO:! r"~ .....{ <br /> <br />"~ <br /> <br />September 30, 1987 <br />P2371 <br /> <br />lO'lINCIl'"4LS <br />"0"''''1.0 C. ""I"SC"'''E:LO. PE. <br />51"EVE: j. FOUl-OS. Pc. <br />OANIEI.;a l,.A.a...TT....pE. <br />'l'Cl-I"''''O'' "'UROOCIl;. Pf!:. <br />GONU,I.O c,r.sTAO. '" E. <br />ASSOC1An:s <br />...0,..... W /CRANCE. '" C. <br /> <br />Mr. John Horton, President <br />Huerfano-Cucharas Irrigation company <br />4338 40th Lane <br />Avondale, co 81022 <br /> <br />SUBJECT: Revised Proposal to Complete Feasibility Study of <br />Cucharas No. 5 Dam and Reservoir According to <br />Colorado Water Conservation Board (CWCB) Requirements <br /> <br />Dear John: <br /> <br />The following proposal outlines the scope of work and esti- <br />mated cost to complete a feasibility level study of modifications <br />to the Cucharas No. 5 dam and reservoir in accordance with ewCB <br />feasibility study requirements. This proposal has been revised <br />based on comments received fro~ the ewCB on our original proposal <br />dated September 18, 1987. <br /> <br />Scope of Work <br /> <br />The work we propose to co~plete would consist of work item3 <br />outlined below which are in accordance with the "Guidelines For <br />Preparation of Feasibility Reports' by the ewCB. Note that the <br />work under Items 5 and 6 includes both the Phase II and Phase III <br />engineering evaluations as oriqinally proposed in our letter of <br />May 22, 1987. The discussion below expands upon the Phase II and <br />Phase III evaluations described in our previous letter. All <br />other work items are necessary to comply with the feasibility <br />study and reporting requirements of the ewCB. <br /> <br />Work Item <br /> <br />Description <br /> <br />ewCB Chapter No. <br /> <br />No.1 <br />No.2 <br />No.3 <br />No.4 <br />No.5 <br />No.6 <br />No.7 <br />No.8 <br />No.9 <br /> <br />General Information <br />The Irrigation Company <br />Land <br />Water <br />plan of Development <br />Estimated Costs <br />Project Evaluation <br />Financial program <br />Feasibility Study Report <br /> <br />I <br />II <br />III <br />IV <br />V <br />VI <br />VII <br />VIII <br /> <br />ATTACHMENT A <br /> <br />OiHER OFF'rce:s: BO~TON . MASSACHUSETTS + CONCORD. NEW HAMPSHIRE <br />