My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150124 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150124 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2010 12:40:53 PM
Creation date
10/5/2006 11:42:08 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150124
Contractor Name
Shultz Farm, Inc.
Contract Type
Loan
Water District
0
County
Weld
Bill Number
MC3
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />t:.llen <br /> <br />970-587-2749 <br />INTERMILL LAND SRW PAGE 01 <br />..-..----..-- <br /> <br />p. l5 <br /> <br />09/19/2002 13:21 9706359775 <br />..~-......_ ___,,_-...~ __.. . ._'""-.'__H.___.' . <br /> <br />Intermill Land Surveying <br /> <br />. RegiSleft'O if! COldoltrJO" \N~ing. <br /> <br />.'" <br />.... <br />'-. <br />, <br />'" <br /> <br />1301 N. Cleveland Ave. <br />Loveland, Colorado 80637 <br />(lJ70) 6611'0516 <br />Fal<: (970) 635-9776 <br />f.maiJ: inlermiN3@earthlink.nel <br /> <br /> <br />Seplen'1ber 19, .2002 <br /> <br />Shulbl Fenn, Inc. <br />Attn.: Steve Shulbl <br />21475 Weld County Road 19 <br />Milliken, Colorado 80543 <br /> <br />RE: Proposal for topollfapbic:al survey on Hili Lake. <br /> <br />Our Steve; <br /> <br />Per your request, tbe fonowing is a cost estimate for the completion of a topographical <br />survey as well 85 an as.built topographical SUI'\I6Y on Hill Lake: <br /> <br />. Provide orisinal topographical SUlVey on Hill Lake. ($1,800.00) <br />· Provide as-built topographical survey when dredsing is complete. (52,400.00) <br /> <br />The above referenced topographical services shall be completed at a cost of Five <br />Thousand Two Hundred nollllrll lIod No CerlU (55,200.00). <br /> <br />Upon acceptance of this cost estimate, a separate Task Agreement will need to be <br />completed and BUthorized prior to the commencement of the project. Estimated time <br />frame for completion of the above listed items sbaU be discussed upon the aeceptance of <br />this proposal and execution of the arorClllentioned Task Agreement. Additional work if <br />requested or required. other tban work outlined above. sball be subject to additional cost <br />on the project to be billed at Intennill Land Surveying. Ine.' s hourly rates current at the <br />time of reqUCl$l. <br />
The URL can be used to link to this page
Your browser does not support the video tag.