Laserfiche WebLink
<br />en <br /> <br />870-587-2748 <br /> <br />1".4 <br /> <br />CWCB Construction Fund Loan Application <br /> <br />lose the river decree. <br /> <br />Water Right: <br /> <br />CFS. <br /> <br />Average water diverted per year: ~ acre-feet. <br /> <br />6. Will the acquisition of additional water rights be necessary? YES <br />If YES, please explain. <br /> <br />NO;L <br /> <br />7. Please list the names and addresses of the Applicants' engineer(s) and attomey(s). <br />NAME ADDRESS and PHONE <br />Duane Smith-Smith Geotechnical 1225 Red Cedar Circle. Suite H <br />Fort CoDins. CO 80524 (970) 490-2620 <br />Intermill Land Survevinl!- Steve Stencel 1301 N Oeveland Ave <br /> <br />Loveland. CO 80537 (970) 669-0516 <br /> <br />8. List any feasibility studies or other investigations that have been completed or are now in progress <br />for the proposed project. Please submit one copy of each completed study with this application. _ <br /> <br />Feasibility Study and TODOI!I'3.Dhical study now in orOl!ress <br /> <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimated <br />construction costs, if known. <br /> <br />Estimated Engineering Costs: <br />Estimated Construction Costs: <br />Estimated Total Costs: <br /> <br />$ 7600.00 <br />$ 315.000.00 - 525.000.00 <br />$ 322.600.00 - 532.600.00 <br /> <br />10. Loan amount and tel1DS you are requesting, <br />Requested Loan Amount: $ 283.500.00 - 472.500.00 (Usually 75% of Estimated To1al Costs) <br />Tel1D (length) ofloan: 30 years (Usually 10,20, or 30 years) <br />Interest Rate: 2.75 % (please call for our current rates) <br /> <br />3 CFLA602 <br />