Laserfiche WebLink
<br />en <br /> <br />870-587-2748 <br /> <br />p.3 <br /> <br />ewCB Construction Fund Loan Application <br /> <br />4. Please provide a brief description of the owner's existing water supply facilities and describe any <br />existing operational or maintenance problems. Attach separate sheets if needed, and a map of the <br />service area. 35 acre natural lake which has silted in after many years <br /> <br />For existing facilities indicate: <br />Number of shareholders N/ A <br />Current Assessment per share $nla <br />Number of acres irrigated 200 <br /> <br />or Number of customers served <br />Number of shares <br /> <br />Part B. - Description of the Project <br />1. Name of the project or facility Hill Lake <br /> <br />2. Purpose of this loan application_ Check one. <br />New project <br />X Rehabilitation or replacement of existing facility <br />Enlargement of existing facility <br />Emergency Repair <br />Other (describe) <br /> <br />3. If the project is for rehabilitation of an existing reservoir, is the reservoir currently under a storage <br />restriction order from the State Engineer? YES _ NO 2L <br /> <br />4. General location of the project. (please include county and approximate distance and direction <br />from nearest town, as well as legal description, ifknown_ Weld county. aDn. 5 miles south of <br />Johnstown. bein!! Partlv in Section 30 and partlv in Section 31. Township 4 North. Ran!!e <br />67. West ofthe 6'h Princinle Meridian. Weld County. Colorado' <br /> <br />5. Please provide a brief narrative description of the proposed project including purpose, need, <br />facilities, type of water uses to be served and service area. Attach separate sheet, if needed. We <br />nronose to clean out the badlv silted un reservoir to brin!! Un the stora!!e capacity to fonner <br />levels. This is a decreed lake with a rimt to 135 acre feet off of the St Vraiu River. The <br />water is used for al!liculture under a nivot sDrinkler. irril!lltinl!' about 200 acres. We need to <br />move annroximatelv 210.000 cubic yards of dirt. Bids we have received have beeu between <br />$1.50 - $2.50 ner cubic yard to move the dirt. We need to clean un the reservoir or we mav <br /> <br />2 <br /> <br />CFLA602 <br />