My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153362 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153362 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 10:15:12 AM
Creation date
10/5/2006 11:41:44 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153362
Contractor Name
Trinidad, City of
Contract Type
Loan
Water District
19
County
Las Animas
Bill Number
SB 81-439
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />North Lake would have provided a constant outflow of <br />7.5 cfs gross, or 6.66 cfs, allowing for evaporation and <br />seepage. The sustained yield would be sufficient to meet <br />projected demands. <br /> <br />Phase I <br /> <br />The facilities needed to upgrade the system include: <br /> <br />1. Expansion of the water treatment plant from its <br />existing capacity of approximately 6.0 mgd to <br />8.5 mgd (9.3 cfs to 13.18 cfs). <br /> <br />2. Installation of an automated valve in the raw <br />transmission line from North Lake to the treat- <br />ment plant. <br /> <br />3. Renovation of the intake structures in both <br />North Lake and Monument Lake to facilitate <br />selective withdrawal of water. <br /> <br />Phase II <br /> <br />Phase II facilities include: <br /> <br />1. Installation of a pipeline, including a pumping <br />station, to divert water from the North Fork to <br />North Lake inlet aqueduct to Monument Lake. <br />This would allow greater utilization of the <br />8.17 cfs senior water rights without changing <br />the point of diversion. <br /> <br />Preliminary designs were made for each of these facilities. <br />Estimated construction costs include: <br /> <br />Phase I: <br /> <br />Treatment Plant Modifications $477,000 <br />North Lake Pipeline Control Valves <br />and Intake structure Renovation 67,000 <br /> <br />Phase II: <br /> <br />North Fork to Monument Lake <br />Pipeline <br /> <br />$648,000 <br /> <br />Contractor move-in, temporary facilities, bond, and insurance <br />would add costs of $71,600. A contingency of 40 percent <br />has also been included to cover design cost, construction <br />management, legal and administrative, rights-of-way, and <br />uncertainty. Thus, the total capital cost required is <br />$1,770,000, based on mid-1980 prices. Phase I cost would <br />be $807,000, and Phase II cost $963,000. <br /> <br />v <br />
The URL can be used to link to this page
Your browser does not support the video tag.