Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />A construction and financing program is outlined, which <br />calls for Colorado Water Conservation Board approval in <br />December, 1980; legislative approval during late spring, <br />1981; design work during spring and summer of 1981; finan- <br />cing arrangements in fall of 1981; and construction of <br />Phase I during winter and spring of 1982. Phase II would <br />be delayed 5 to 7 years at a cost escalation of 10 percent <br />per year until that time. The Phase I construction cost <br />will increase to $931,300. Proposed financing sources are <br />as follows: <br /> <br />state Loan <br />Energy Impact Funds <br />Municipal Bond Issue <br /> <br />$465,650 <br />350,000 <br />115,650 <br /> <br />An analysis of the City's water utility system indicates <br />that the City can payoff the state loan for Phase lover <br />30 years at 4 percent, payoff the new municipal bond over <br />30 years at 9 percent, payoff an existing 1975 bond issue <br />(which is to be paid off by 1985), and operate the utility <br />with reasonable increases in water rates. The rates would <br />have to be increased 18 percent in 1981, 20 percent in <br />1982, 8 percent in 1988, 10 percent in 1989, and 8 percent <br />in 1990 to meet operating expenses and repayment of the <br />state loan and municipal bonds. The bulk of the rate <br />increases go into escalated operating expenses, due to <br />inflation. <br /> <br />Even with Phase II scheduled for development 5 years <br />later, the City can payoff the combined cost with a <br />modest increase in revenues of 7.6 per year. <br /> <br />RECOMMENDATIONS <br /> <br />The following recommendations are made: <br /> <br />1. The City of Trinidad's City Council should adopt <br />a program of water supply improvements as outlined <br />in this Feasibility Study, utilizing the phased <br />approach discussed. <br /> <br />2. Phase I of the water supply improvement project <br />should be submitted to the Colorado Water Con- <br />servation Board, with a request for 50 percent <br />financing through the Water Project Construction <br />Fund. The estimated loan requirement for Phase I <br />facilities is $465,650 based on 1980 cost estimates. <br />The requested repayment period should be 30 years <br />at a 4-percent interest rate. <br /> <br />vi <br />