<br />TABLE 7. COST ESITMATE FOR INDIAN CREEK REHABILITATION OPTION #1.
<br />
<br />ITEM DESCRIPTION QUANTITY UNITS UNIT PRICE AMOUNT
<br />1. MOBILIZATION, INSURANCE, 1.00 LS, $10,000.00 $10,000,00
<br /> BONDS
<br />2, STRIPPING AND CLEARING 1.00 LS, $3,000,00 $3,000.00
<br />3, EARTH EXCAVATION 4000,00 .C,Y. $2.00 $8,000,00
<br />4, EARTH FILL 4000.00 C.Y, $3,00 $12,000,00
<br />6. INCREMENTAL DAMAGE 1.00 LS, $30,000.00 $30,000.00
<br /> STUDY
<br />8. 100-FT SPILLWAY 100,00 LF, $150,00 $15,000,00
<br />10, SEEDING 3,00 ACRE $1,000,00 $3,000,00
<br />II. EASMENTS 1.00 LS. $75,000.00 $75,000,00
<br />II. ENGINEERING AND 1.00 LS, $44,000.00 $44,000.00
<br /> CONTINGENCIES
<br />
<br />TOTAL $200,000,00
<br />
<br />Option number two would construct a 500-foot long spillway at the existing spillway location to handle
<br />PMF waters for the sub-basin immediately surrounding Indian Creek Reservoir and lower the
<br />downstream bank of the Cheyenne Ditch approximately three feet to allow PMF waters from the
<br />extensive upstream sub-basins to flow into the historic Indian Creek basin, The construction of an
<br />earthen berm at the inlet to Indian Creek Reservoir would ensure that only a limited amount of
<br />floodwaters would enter Indian Creek Reservoir, Extensive survey data will be needed to determine
<br />exact spillway length and berm height. A cost estimate for this option can be found in Table 8,
<br />
<br />TABLE 8. COST ESTIMATE FOR INDIAN CREEK REHABILITATION OPTION #2.
<br />
<br />ITEM DESCRIPTION QUANTITY UNITS UNIT PRICE AMOUNT
<br />1. MOBILIZATION, INSURANCE, 1.00 LS, $12.500,00 $12.500,00
<br /> BONDS
<br />2. STRIPPING AND CLEARING 1.00 LS. $3.000,00 $3,000,00
<br />3, EARTH EXCAVATION 3200.00 c.y, $2,00 $6,400,00
<br />4. EARTH FILL 8500,00 C.Y, $3.00 $25.500.00
<br />6, SPILLWAY 500,00 LF, $150,00 $75,000.00
<br />17. SEEDING 5.00 ACRE $1,000.00 $5.000,00
<br />8. EASMENTS 1.00 LS. $75,000,00 $75.000,00
<br /> ENGINEERING AND 1.00 LS, $57,000,00 $115,000.00
<br /> CONTINGENCIES
<br />
<br />TOTAL $317,400.00
<br />
<br />The third option would construct the 500-foot spillway and lower the embankment on the Cheyenne
<br />Ditch as in option two, replace the outlet works, flatten the downstream slope of the existing dam, and
<br />add a toe drain to the area of dam where seepage is occurring, A cost estimate for this option is shown
<br />in Table 9,
<br />
<br />Page 16