<br />I <br />I <br />I <br />il <br />I <br />I <br />il <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I, <br /> <br />TABLE 7. COST ESITMATE FOR INDIAN CREEK REHABILITATION OPTION #1. <br /> <br />ITEM DESCRIPTION QUANTITY UNITS UNIT PRICE AMOUNT <br />1. MOBILIZATION, INSURANCE, 1.00 LS, $10,000.00 $10,000,00 <br /> BONDS <br />2, STRIPPING AND CLEARING 1.00 LS, $3,000,00 $3,000.00 <br />3, EARTH EXCAVATION 4000,00 .C,Y. $2.00 $8,000,00 <br />4, EARTH FILL 4000.00 C.Y, $3,00 $12,000,00 <br />6. INCREMENTAL DAMAGE 1.00 LS, $30,000.00 $30,000.00 <br /> STUDY <br />8. 100-FT SPILLWAY 100,00 LF, $150,00 $15,000,00 <br />10, SEEDING 3,00 ACRE $1,000,00 $3,000,00 <br />II. EASMENTS 1.00 LS. $75,000.00 $75,000,00 <br />II. ENGINEERING AND 1.00 LS, $44,000.00 $44,000.00 <br /> CONTINGENCIES <br /> <br />TOTAL $200,000,00 <br /> <br />Option number two would construct a 500-foot long spillway at the existing spillway location to handle <br />PMF waters for the sub-basin immediately surrounding Indian Creek Reservoir and lower the <br />downstream bank of the Cheyenne Ditch approximately three feet to allow PMF waters from the <br />extensive upstream sub-basins to flow into the historic Indian Creek basin, The construction of an <br />earthen berm at the inlet to Indian Creek Reservoir would ensure that only a limited amount of <br />floodwaters would enter Indian Creek Reservoir, Extensive survey data will be needed to determine <br />exact spillway length and berm height. A cost estimate for this option can be found in Table 8, <br /> <br />TABLE 8. COST ESTIMATE FOR INDIAN CREEK REHABILITATION OPTION #2. <br /> <br />ITEM DESCRIPTION QUANTITY UNITS UNIT PRICE AMOUNT <br />1. MOBILIZATION, INSURANCE, 1.00 LS, $12.500,00 $12.500,00 <br /> BONDS <br />2. STRIPPING AND CLEARING 1.00 LS. $3.000,00 $3,000,00 <br />3, EARTH EXCAVATION 3200.00 c.y, $2,00 $6,400,00 <br />4. EARTH FILL 8500,00 C.Y, $3.00 $25.500.00 <br />6, SPILLWAY 500,00 LF, $150,00 $75,000.00 <br />17. SEEDING 5.00 ACRE $1,000.00 $5.000,00 <br />8. EASMENTS 1.00 LS. $75,000,00 $75.000,00 <br /> ENGINEERING AND 1.00 LS, $57,000,00 $115,000.00 <br /> CONTINGENCIES <br /> <br />TOTAL $317,400.00 <br /> <br />The third option would construct the 500-foot spillway and lower the embankment on the Cheyenne <br />Ditch as in option two, replace the outlet works, flatten the downstream slope of the existing dam, and <br />add a toe drain to the area of dam where seepage is occurring, A cost estimate for this option is shown <br />in Table 9, <br /> <br />Page 16 <br />