Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />il <br />I <br />il <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The second option considered would maintain the dam crest at approximately the existing elevation of <br />gage height 22 feet. move the spillway to near the center of the dam, fill the existing spillway. fill low <br />areas along the right abutment, replace the existing outlet works and Parshall flume, install a new toe <br />drain, reshape the upstream face of the dam, and riprap the upstream face of the dam and spillway <br />area, This option would bring the dam into compliance with State regulations and allow the storage of <br />water to approximately gage height 19 feet, A cross-section near the outlet of this option is shown in <br />Figure 5, The majority of this construction could be accomplished on NPIC lands. The estimated cost <br />to complete this option is shown in Table 6, <br /> <br />TABLE 6. COST ESTIMATE FOR NPIC #4 DAM REHABILITAION OPTION #2. <br />ITEM DESCRIPTION QUANTITY UNITS UNIT PRICE AMOUNT <br />1. MOBILIZATION, INSURANCE, BONDS 1.00 L.S, $14,000.00 $14,000,00 <br />2, STRIPPING AND REMOVING TREES 1.00 L.S, $2,000,00 $2.000,00 <br />3, DEWATERING 1.00 L.S, $10.000,00 $10,000,00 <br />4. GENERAL EARTH MOVING <br />a) Dam Borrow and Fill <br />b) Inlet Channel Excavation <br />c) Breach Excavation and Fill <br />RIPRAP <br />RIPRAP BEDDING <br />TOE DRAIN <br />REPLACE OUTLET WORKS <br /> <br />5. <br />6, <br />7, <br />8, <br /> <br />a) Demolition and Removal <br />b) Inlet Structure With Gate <br />c) Outlet Tower With Gate <br />d) Outlet Headwall <br />e) 30" Concrete Pipe <br />9, SPILLWAY <br />10. PARSHALL FLUME <br />II. SEEDING <br />12, ENGINEERING AND CONTINGENCIES <br /> <br />Page 13 <br /> <br />2500.00 <br />3680,00 <br />3600.00 <br />6000,00 <br />2000.00 <br />1000.00 <br /> <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />130.00 <br />50,00 <br />1.00 <br />1 <br />1 <br /> <br />C,Y, <br />C,Y, <br />C,Y. <br />TON <br />TON <br />L.F. <br /> <br />$4.00 $10,000.00 <br />$3,00 $11.040.00 <br />$4.00 $14,400.00 <br />$25,00 $150.000,00 <br />$18,00 $36,000.00 <br />$20,00 $20,000.00 <br /> <br />L.S, $4,000,00 $4,000.00 <br />L.S. $20,000,00 $20,000.00 <br />L.S. $30,500,00 $30.500.00 <br />L.S. $12,000,00 $12,000.00 <br />L.F. $110,00 $14,300.00 <br />L.F, $150,00 $7,500.00 <br />L.S, $15.000.00 $15,000,00 <br />L.S, $5,000.00 $5.000,00 <br />L.S. $112,722,00 $112,722.00 <br />TOTAL $488,462.00 <br />