<br />The second option considered would maintain the dam crest at approximately the existing elevation of
<br />gage height 22 feet. move the spillway to near the center of the dam, fill the existing spillway. fill low
<br />areas along the right abutment, replace the existing outlet works and Parshall flume, install a new toe
<br />drain, reshape the upstream face of the dam, and riprap the upstream face of the dam and spillway
<br />area, This option would bring the dam into compliance with State regulations and allow the storage of
<br />water to approximately gage height 19 feet, A cross-section near the outlet of this option is shown in
<br />Figure 5, The majority of this construction could be accomplished on NPIC lands. The estimated cost
<br />to complete this option is shown in Table 6,
<br />
<br />TABLE 6. COST ESTIMATE FOR NPIC #4 DAM REHABILITAION OPTION #2.
<br />ITEM DESCRIPTION QUANTITY UNITS UNIT PRICE AMOUNT
<br />1. MOBILIZATION, INSURANCE, BONDS 1.00 L.S, $14,000.00 $14,000,00
<br />2, STRIPPING AND REMOVING TREES 1.00 L.S, $2,000,00 $2.000,00
<br />3, DEWATERING 1.00 L.S, $10.000,00 $10,000,00
<br />4. GENERAL EARTH MOVING
<br />a) Dam Borrow and Fill
<br />b) Inlet Channel Excavation
<br />c) Breach Excavation and Fill
<br />RIPRAP
<br />RIPRAP BEDDING
<br />TOE DRAIN
<br />REPLACE OUTLET WORKS
<br />
<br />5.
<br />6,
<br />7,
<br />8,
<br />
<br />a) Demolition and Removal
<br />b) Inlet Structure With Gate
<br />c) Outlet Tower With Gate
<br />d) Outlet Headwall
<br />e) 30" Concrete Pipe
<br />9, SPILLWAY
<br />10. PARSHALL FLUME
<br />II. SEEDING
<br />12, ENGINEERING AND CONTINGENCIES
<br />
<br />Page 13
<br />
<br />2500.00
<br />3680,00
<br />3600.00
<br />6000,00
<br />2000.00
<br />1000.00
<br />
<br />1.00
<br />1.00
<br />1.00
<br />1.00
<br />130.00
<br />50,00
<br />1.00
<br />1
<br />1
<br />
<br />C,Y,
<br />C,Y,
<br />C,Y.
<br />TON
<br />TON
<br />L.F.
<br />
<br />$4.00 $10,000.00
<br />$3,00 $11.040.00
<br />$4.00 $14,400.00
<br />$25,00 $150.000,00
<br />$18,00 $36,000.00
<br />$20,00 $20,000.00
<br />
<br />L.S, $4,000,00 $4,000.00
<br />L.S. $20,000,00 $20,000.00
<br />L.S. $30,500,00 $30.500.00
<br />L.S. $12,000,00 $12,000.00
<br />L.F. $110,00 $14,300.00
<br />L.F, $150,00 $7,500.00
<br />L.S, $15.000.00 $15,000,00
<br />L.S, $5,000.00 $5.000,00
<br />L.S. $112,722,00 $112,722.00
<br />TOTAL $488,462.00