Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1.1 <br /> <br />IlL 1 <br /> <br />IV.l <br />IV.2 <br /> <br />V.l <br />V.2 <br />V.3 <br />V.4 <br />V.5 <br />V.6 <br />V.7 <br />V.8 <br /> <br />V1.l <br /> <br />FEASIBILITY STUDY FOR ENLARGING ELKHEAD LAKE DAM AND RESERVOIR <br /> <br />LIST OF FIGURES <br /> <br />PAGE <br /> <br />Proj ect 11ap 2 <br /> <br />Property Ownership Map 15 <br /> <br />Population Projections 1985-2030 17 <br /> <br />Projected Annual Water Usage 1985-2030 19 <br /> <br />Location and Vicinity r~aps, Genenl Infonnation 34 <br />Geotechnical Investigations 38 <br />Design Alternatives: Cost vs. Capacity 42 <br />Project P1 an 45 <br />Embankment Dam I~odification: Sections 47 <br />Service Spillway Modification: Sections 49 <br />Auxiliary Spillway and County Road: Sections 50 <br />Embankment Dam ~'odification: Stability Analysis 55 <br /> <br />Project Schedule and Interest During Project Execution 57 <br />