My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00170
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00170
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:10 AM
Creation date
10/5/2006 11:41:31 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153481
Contractor Name
Colorado River Water Conservation District
Water District
0
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1.1 <br /> <br />IlL 1 <br /> <br />IV.l <br />IV.2 <br /> <br />V.l <br />V.2 <br />V.3 <br />V.4 <br />V.5 <br />V.6 <br />V.7 <br />V.8 <br /> <br />V1.l <br /> <br />FEASIBILITY STUDY FOR ENLARGING ELKHEAD LAKE DAM AND RESERVOIR <br /> <br />LIST OF FIGURES <br /> <br />PAGE <br /> <br />Proj ect 11ap 2 <br /> <br />Property Ownership Map 15 <br /> <br />Population Projections 1985-2030 17 <br /> <br />Projected Annual Water Usage 1985-2030 19 <br /> <br />Location and Vicinity r~aps, Genenl Infonnation 34 <br />Geotechnical Investigations 38 <br />Design Alternatives: Cost vs. Capacity 42 <br />Project P1 an 45 <br />Embankment Dam I~odification: Sections 47 <br />Service Spillway Modification: Sections 49 <br />Auxiliary Spillway and County Road: Sections 50 <br />Embankment Dam ~'odification: Stability Analysis 55 <br /> <br />Project Schedule and Interest During Project Execution 57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.