Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I I <br />I <br /> <br />1.1 <br />1.2 <br /> <br />I I. 1 <br /> <br />IV.1 <br />IV.2 <br />IV.3 <br />IV.4 <br />IV.5 <br />IV.6 <br /> <br />Vr.1 <br />VI. 2, <br />VI.3 <br />VI.4 <br />VI. 5 <br />VI.6 <br />Vr.7 <br /> <br />VII.1 <br /> <br />FEASIBILITY STUDY FOR ENLARGING ELKHEAD LAKE DAM AND RESERVOIR <br /> <br />LIST OF TABLES <br /> <br />Normal Monthly Temperatures <br />Normal i~onth1y Precipitation <br /> <br />Revenue Bond Coverage <br /> <br />Average Monthly Demand Pattern for the Period 1982-1986 <br />Hi storica1 r~aximum Monthly and Daily Demands <br />Municipal Direct Flow Water Rights <br />Monthly Water Use by Senior Direct Flow Rights <br />E1khead Lake Operations <br />Water Quality for the Yampa River near Maybe11, Colorado <br />for Water Years 1981-1983 <br /> <br />Project Cost Summary <br />Construction Cost Estimate <br />Engineering and Construction Management <br />Financial Responsibility <br />Funding Requirements <br />Oper~tion, ~aintenance, and Replacement Costs <br />Unit Cost per Acre-Foot <br /> <br />Municipal Water Rate Comparison <br /> <br />PAGE <br /> <br />3 <br />4 <br /> <br />12 <br /> <br />20 <br />20 <br />22 <br />25 <br />29 <br />31 <br /> <br />58 <br />59 <br />60 <br />61 <br />62 <br />63 <br />64 <br /> <br />65 <br /> <br />VIII.1 Financial Program and Pay-Out Schedule for E1khead Lake 74 <br />