My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00166
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00166
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:10 AM
Creation date
10/5/2006 11:41:20 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153311
Contractor Name
Nunn, Town of
Contract Type
Loan
Water District
0
County
Weld
Bill Number
SB 78-69
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The recommendations contained in this report for improvements to the <br />existing water supply system for Nunn are as follows: <br />1. Construct two or more shallow aquifer wells as needed in the <br />Lone Tree Creek Basin, north and east of Nunn. <br />2. Construct the following pipe system improvements: <br />a. 9100~ feet (depends on the location of wells determined <br />in final design) of 6" transmission line from the new wells <br />to tie into existing distribution system in the Town. <br />b. An additional 7510 feet of 6" distribution pipeline within <br />the Town. <br />c. Miscellaneous valves, hydrants, crosses, etc. associated <br />with pipelines. <br />3. Construct an additional 50,000 gallon elevated storage tank with <br />necessary piping, valves, etc. <br />4. Installation of an electrical system to automate pump operation <br />and to control the water level in the storage tanks. <br />The estimated cost of the above improvements including a contingency of <br />15% and 11% for engineering and construction inspection services is $313,400 <br />(1977 costs). <br />The Town of Nunn has several options on financing the water system <br />improvements. One of the options would be that the Town of Nunn make appli- <br />cation for a $125,500.00, 25 year loan (3% interest) from the Colorado Water <br />Conservation Board. This would necessitate that the Town also apply for a <br />$186,900 grant from the Farmers Home Administration to pay for the remaining <br />cost of the improvements. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.