My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00166
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00166
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:10 AM
Creation date
10/5/2006 11:41:20 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153311
Contractor Name
Nunn, Town of
Contract Type
Loan
Water District
0
County
Weld
Bill Number
SB 78-69
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The other two phases are desirable and recommended, but the scheduling for <br />construction depends on the Town's desire to implement the recommendations <br />and on the availability of grant and loan money from any of several govern- <br />ment agencies. <br />The costs presented above and in the Appendix are based on 1977 costs <br />without any escalation factors, However, an 8% escalation factor per year <br />can be used to determine the increased costs of delay in the implementation <br />of the recommended improvements. <br />B. Operations and Maintenance <br />Table V-2 presents the operating budget for the Town of Nunn for <br />the last three years for the operation of the water system. Included in <br />the table is the income from water users from the sale of water and system <br />connection charges and the operation and maintenance expenses including <br />debt payment on long term debts. For the past three years, the average <br />annual operating and maintenance costs attributable to the water system <br />excluding debt repayment costs is about $5,900 per year. Adding to this <br />the average annual debt repayment costs for the last three years, the <br />annual costs are about $8,200/year, This translates into an average <br />cost of $5.70 per water tap per month. The Town has two 10 year improvement <br />loans at the present time. A $16,000 loan at 6% was taken out in March <br />1974 and a $9,000, 6% loan was taken out in March 1976. These loans will <br />mature in 1984 and 1986, respectively, reducing the current annual expenses <br />by about $3,330/year, <br /> <br />29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.