Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Sub-total New Well System <br />Plus 15% Contingency, plus <br />lU, Engineering & Construction <br />Services <br /> <br />TOTAL New Well System <br /> <br />Phase B - Distribution System <br /> <br />Additional 7,510 feet of 6" PVC <br />for distribution piping <br />Plus 15% Contingency and 11% <br />Engineering & Construction Services <br /> <br />Sub- Tota 1 <br /> <br />Plus New Well System <br /> <br />TOTAL Phase A & B <br /> <br />Phase C - Additional Storage <br /> <br />Construction of a 50,000 gallon <br />eleJated steel water storage tank <br />Plus 15% Contingency and 11% <br />Engineering & Construction Services <br /> <br />Sub-Total <br /> <br />Plus Phase A and B <br /> <br />TOTAL Phases A, B & C <br /> <br />$ 94,600 <br /> <br />-"4,600 <br />$119,200 <br /> <br />$ 54,100 <br />14,100 <br />$ 68,200 <br />119,200 <br />$187,400 <br /> <br />$100,000 <br /> <br />26,000 <br /> <br />$126,000 <br />187,400 <br />$313,400 <br /> <br />A detailed listing of the costs are included in the Appendix. The <br />construction of Phases Band C are independent of each other and of <br />Phase A and can be made at any time. Phase C of Alternate 1 is the <br /> <br />recommendation for improvements to meet existing demands and future demands <br /> <br />to the year 2000, The construction of the improvements indicated as Phase A <br /> <br />has the highest priority and must be made in order to correct the current <br /> <br />water quality problem of excessive nitrates in the water supply. <br /> <br />28 <br />