Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />D. <br /> <br />Service Area Descrintion Man <br />The District Service area is shown on Figure 2. <br /> <br />E. <br /> <br />Plan of Develonment <br /> <br />The District currently anticipates full build-out of the 2704 acre District area would <br /> <br />include approximately 2566 single family units, a school and park facilities. Currently <br /> <br />about 498 homes are built and utilizing District services and 45 to 60 additional <br /> <br /> <br />homes are scheduled to be built within the next 12 months. About 38 acres of the <br /> <br />park system have been constructed at this time. <br /> <br />F. <br /> <br />Water Demands <br /> <br />Current water demands of the District as well as those projected at full build-out are <br />indicated in Table 1. <br /> <br /> TABLE 1 <br /> Castle Pines North Metropolitan District <br /> Current and Full Build-out Potable Water Use <br />Use No. Units In-house Irrigation Total <br /> (aflvrl ( afM) (af/vr) <br />Current <br />Residential 480 186 165 351 <br />aDen SDace/Parks 38 ac 95 95 <br /> Total 446 <br />Full Build-out <br />Residential 2566 996 882 1878 <br />Open Space/Parks 161 ac 403 403 <br />School and other 150 29 179 <br /> Total 2460 <br /> <br />11 <br /> <br />Jehn Water Consultants, Inc. <br />