Laserfiche WebLink
<br />Stdte if such ti.me is insufficient becduse of acts of God or <br />other dcls or circumsldnces beyolld the conlrol of lhe <br />Contrdctor. <br /> <br />3. Require dll Sub-contrdctors Lo indemni fy the SLdLe dnd <br />the Contrdctor against all I idbility and loss, and against all <br />claims dnd dctions based upon or drising out of ddmage or <br />Injury, including dedth, to persons or property caused by or <br />sustdined In connecLion wilh the p(~rformdnce of dny sub~ <br />contract or by conditions credled thereby, or based upon dny <br />violation of any statute, ordinance, or regulation, and the <br />defense of any such claims or dctions. <br /> <br />4. Require all Sub-contrdctors to mdintain Liability <br />insurance in at least the following dmounts: <br /> <br />a. For any injury to one person in dny single <br />occurrence, the sum of One Hundred Fifty Thousand <br />Dollars ($150,000). <br /> <br />b. For any .injury to two or more persons in any <br />single occurrence, the sum of Four Hundred Thousdnd <br />Dollars ($400,000). <br /> <br />Sdid I iabili.ty insurdnce shall name the Contrdctor <br />dnd the State dS co-insureds. No payments shall be mdde under <br />this contrdct unless a copy of a certificate of said liability <br />insurdnce hds been filed with the Colorado Water Conservation <br />BOdrd. <br /> <br />5. Conveyor cause title to be conveyed by deed or <br />other proper conveyance to the Colorado Water ConservatIon <br />BOdrd, Depdrtment of Naturdl Resources, State of Colorddo, the <br />following portions of the proposed project facilities within <br />thirty (30) days of their completion: <br /> <br />a. 170 feeL of d 4-foot deep steel cutoff wdll. <br /> <br />b. 175 feet of d trdpezoidal section channel, <br />20-foot base dnd 10-foot depth at d 3 to 1 slope, <br />locdted between stdlions 0+20 dnd 1+95. <br /> <br />c. 2115 squdre yards of filter fabric mdterIal, <br />located between stations 0+20 dnd 1+95. <br /> <br />d. 1000 cubic Ydrds of rockfill mdterial hduled <Clnd <br />mdchine placed between stations 0+20 dnd 1+95. <br /> <br />All of the above will be located in the generdl dam <br />dnd reservoir dred. <br /> <br />6. Permit periodic inspection of construction by <br />duthorized represenldt.ives of tile SLale during dnd dfLer <br />construction. <br /> <br />7. Without expense to the State, mdndge, operate, dnd <br />mdinlain I.tle project system c()nlinuously in dn efficicl1I. clnd <br />economicdl mdllner, dnd dSSume dll legal tidbtt ity for such <br />mandgemenl, operdtion, dnd mdintenance. The Contrdctor shdll <br />mdintain generdl lidbility insurdnce co~ering its mandgement, <br />operdtion, dnd mdIntendnce of Lhe project sysLem unLil it hds <br />compleL(~d purchdse of the project sysL(;~m from the SldLe i: aL <br />least the folLowing amounts: <br /> <br />d. For dny injury to one person in dny single <br />occurrence, the sum of One Hundred Fifly ThouSdnd <br />Dollars ($150,000). <br /> <br />Pd~J(~ ? 0 r 7 p,l(J (~5 <br />