My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00159
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00159
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:09 AM
Creation date
10/5/2006 11:41:07 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153305
Contractor Name
Dolores Water Conservancy District
Water District
0
County
Dolores
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />15/ <br />Company. Results of a study completed in 1968-69 by Clark-Thomas Engineers,-- <br /> <br /> <br />however, indicated that it was infeasible to provide service to the area, unless <br /> <br /> <br />users are willing to pay exorbitant initial tap fees. <br /> <br />! I <br /> <br />I <br /> <br />I <br />I <br /> <br />If and when it becomes economically feasible to serve this area, additional pumping <br /> <br /> <br />and storage faci1ites will be required. Approximately twenty-five miles of dis- <br /> <br /> <br />tribution line must be installed to serve 150 residences. Further, Summit Ridge <br /> <br /> <br />will have to be incorporated into the Dolores Water Conservancy District. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />-49- <br />
The URL can be used to link to this page
Your browser does not support the video tag.