My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00159
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00159
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:09 AM
Creation date
10/5/2006 11:41:07 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153305
Contractor Name
Dolores Water Conservancy District
Water District
0
County
Dolores
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />3. Authority to enter into contractual arrangements <br /> <br /> <br />4. The authority to vest title to a portion of the proposed project in the <br /> <br /> <br />Colorado Water Conservation Board to secure the anticipated advanced funds. <br /> <br />A copy of the decree establishing the Dolores Water Conservancy District is in- <br />cluded in the Appendix as Exhibit A-l, <br /> <br />C. FINANCIAL STATUS <br />The budgets adopted for 1979 and 1980 are given in Table A-4 of the Appendix. <br />Included in the Appendix as Exhibit A-2 is the Audit Report for 1978. <br /> <br />D. PHYSICAL ASSETS <br /> <br /> <br />The Dolores Water Conservancy District is not currently providing any water treat- <br /> <br /> <br />ment or transmission services, nor is it, as yet, managing any Dolores Project <br /> <br />facilities. Therefore, the present physical assets are limited to the general <br /> <br /> <br />office equipment which is valued at approximately $12,000. The district, of <br /> <br /> <br />course, will ultimately be responsible for operating the water treatment and <br /> <br /> <br />transmission systems proposed in this report, as well as the dam, tunnel, canals <br /> <br /> <br />and equipment associated with the Dolores Project. In the future, after the Bureau <br /> <br /> <br />of Reclamation has fulfilled its obligations in the area, the district will have <br /> <br /> <br />a considerable interest in the Dolores River Project office building which is <br /> <br /> <br />currently under construction. <br /> <br />Under the provisions of a contract between the Dolores Water Conservancy District <br /> <br /> <br />and the Bureau of Reclamation, the district will obtain sufficient water rights for <br /> <br /> <br />the supplemental municipal and industrial supplies requested. The district will be <br /> <br /> <br />responsible for providing payment covering the delivery costs and operation and <br /> <br /> <br />maintenance costs associated with both project and non-project water. The re- <br /> <br /> <br />payment obligation is to be in effect a period of fifty years or less. Estimated <br /> <br /> <br />amounts of disbursement are contingent upon the actual cost of the facilities. <br /> <br />The assessed valuation for 1980 of the parts of Dolores and Montezuma Counties <br />contained within the district is $37,911,086. <br /> <br />-11- <br />
The URL can be used to link to this page
Your browser does not support the video tag.