My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00159
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00159
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:09 AM
Creation date
10/5/2006 11:41:07 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153305
Contractor Name
Dolores Water Conservancy District
Water District
0
County
Dolores
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />B. CLIMATE: <br /> <br />I <br /> <br />Low precipitation, abundant sunshine, moderate winds, and wide temperature <br /> <br /> <br />variations are characteristic of the climate in Montezuma and Dolores Counties. <br /> <br />I <br /> <br />Maximum and minimum average recorded temperatures in the project vicinity are 860 <br /> <br /> <br />to 920 F. in July, and 120 to 150 F. in January, respectively. Generally, the <br /> <br /> <br />length of the frostfree period is from mid-March until mid-November. However, <br /> <br /> <br />there is a very wide variation in climate from year to year and between the <br /> <br /> <br />average and the extremes. The following table, excerpted from the Wastewater <br /> <br /> <br />Treatment Facility Plan for cortez,!Q/ provides a graphic illustration of the <br /> <br /> <br />average monthly temperatures (degrees) and the average monthly precipitation <br /> <br /> <br />(inches) in the area. Readings were obtained over a 43-year period at a data <br /> <br /> <br />coliection station in Cortez. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Table 2- i Average Monthly Te~~erature and Precipitation - Cortez <br /> J F M A M J J A S 0 N D <br />Avg. Temp. 27.0 32.1 38.5 47.0 55.9 64.6 71.6 69.7 61.9 50.9 37.7 29,1 <br />Avg. Precip- <br />itation .94 .97 L09 .97 .85 .52 1.19 1.55 1.39 L53 .81 1.17 <br /> <br />I <br /> <br />I <br /> <br />Average annual precipitation ranges from 11 to 13 inches in the service area. <br /> <br /> <br />Southwestern Montezuma County may have less than 8 inches of precipitation. In <br /> <br /> <br />the high mountains to the northwest, precipitation may be as high as 40 inches <br /> <br /> <br />per year. <br /> <br />I <br /> <br />I <br /> <br />We do not expect any adverse effects on the project due to climatologi~al factors <br /> <br /> <br />such as high winds and hail, other than temporary inconvenience during the layout <br /> <br /> <br />and/or construction period. It is not unusual for construction projects, including <br /> <br /> <br />excavation for water distribution lines, to be carried on year-round in this vicinity. <br /> <br /> <br />However, construction may be interrupted in January and parts of February. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />J <br /> <br />J <br /> <br />-9- <br />
The URL can be used to link to this page
Your browser does not support the video tag.