My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00156
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00156
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:02:52 AM
Creation date
10/5/2006 11:40:59 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153721
Contractor Name
Lyons, Town of
Contract Type
Loan
Water District
5
County
Boulder
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Table 12. Conceptual costs for Water System Improvements <br /> <br />Sub-System Major Improvement Packages Conceptual Costs <br /> ($ 1995) <br />I. Water supply, · Reconstruct the diversion and intake works <br /> on N. St. Vrain Creek. $374,000 <br />raw water intake, <br /> · Perform a Composite Correction Program to <br />treatment plant. address the operational, maintenance and $12,000 <br /> administrative deficiencies noted in this report. <br /> · Start a major capital improvements program <br /> for the existing WTP; design and construction. $322,000 <br /> . Design and build a new 1.0 to 1.2 MGD $1.13 million <br /> WTP to provide peak flows. <br />2. Finished wafer . Develop a reliability-improvement program Special study <br />transmission and for the transmission line. <br />storage. <br /> · Construction of a 1.0 to 1.3 MG storage $610,000 to <br /> tank in the lower pressure zone with backbone $960,000 <br /> piping improvements. <br /> · Construction of a storage tank in the upper <br /> pressure zone, using a new or existing tank, $447,000 <br /> with associated piping improvements. <br /> · Upgrade 6-inch and smaller pipes in the <br /> town's distribution system to 8 inch to Master Plan <br /> improve pressures and fire flows. Complete a <br /> I2-inch "backbone" distribution line. <br /> . Construct 8-inch diameter tie line from <br /> Lyons Valley Park to Highway 36. Developer <br /> <br />49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.