Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Table 12. Conceptual costs for Water System Improvements <br /> <br />Sub-System Major Improvement Packages Conceptual Costs <br /> ($ 1995) <br />I. Water supply, · Reconstruct the diversion and intake works <br /> on N. St. Vrain Creek. $374,000 <br />raw water intake, <br /> · Perform a Composite Correction Program to <br />treatment plant. address the operational, maintenance and $12,000 <br /> administrative deficiencies noted in this report. <br /> · Start a major capital improvements program <br /> for the existing WTP; design and construction. $322,000 <br /> . Design and build a new 1.0 to 1.2 MGD $1.13 million <br /> WTP to provide peak flows. <br />2. Finished wafer . Develop a reliability-improvement program Special study <br />transmission and for the transmission line. <br />storage. <br /> · Construction of a 1.0 to 1.3 MG storage $610,000 to <br /> tank in the lower pressure zone with backbone $960,000 <br /> piping improvements. <br /> · Construction of a storage tank in the upper <br /> pressure zone, using a new or existing tank, $447,000 <br /> with associated piping improvements. <br /> · Upgrade 6-inch and smaller pipes in the <br /> town's distribution system to 8 inch to Master Plan <br /> improve pressures and fire flows. Complete a <br /> I2-inch "backbone" distribution line. <br /> . Construct 8-inch diameter tie line from <br /> Lyons Valley Park to Highway 36. Developer <br /> <br />49 <br />