<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Water Transmission Line <br /> <br />Conduct a special study of the 12-inch transmission line. The objective is to increase <br />the reliability of the pipeline. The study should include a corrosion analysis, transient <br />analysis and field verification of the line's overall condition. <br /> <br />Table 8. Conceptual Costs of Distribution and Storage Improvements <br /> <br />Line Item Conceptual Costs <br /> ($ 1995) <br />· Develop a reliability-improvement program for the finished Prepare <br />water transmission line. separate study <br />· Construction of a 1.0 to 1.3 MG storage tank in the lower $610,000 to <br />pressure zone with backbone piping improvements. $960,000 <br />· Design and construction of a storage tank in the upper <br />pressure zone, using a new tank or an existing tank, with $447,000 <br />associated piping improvements. <br />· Upgrade 6-inch and smaller pipes in the town's distribution Prepare a <br />system to 8 inch to improve pressures and fire flows. Include Master Plan <br />completion of the I2-diameter "backbone" line through town. <br />· Construct 8-inch diameter tie line from Lyons Valley Park Paid for by <br />to Highway 36. Developer <br /> <br />39 <br />