<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Water Transmission Line <br /> <br />We recommend that the town conduct a special study on the 12-inch transmission line. <br />The objective is to increase the reliability of the pipeline. The study should include a <br />corrosion analysis, transient (pressure surge) analysis and field verification of the line's overall <br />condition. <br /> <br />5.4 Recommended Storage and Distribution Improvements <br /> <br />The existing system has reached its capacity to provide adequate storage and meet maximum <br />day flow requirements. It has significant deficiencies for fire protection, especially in the <br />upper pressure zone. <br /> <br />In summary, the following improvements are proposed: <br /> <br />1. Add a storage tank and associated piping improvements for the upper pressure zone <br />at the same hydraulic grade line as the existing storage tank in the high pressure zone. <br />Preliminary location for this facility is above the Russell Subdivision. The existing <br />0.35 MG tank could be considered to satisfy this requirement. <br /> <br />2. Add a 1.0 to 1.5 MG storage tank and associated piping improvements for the lower <br />pressure zone. This tank should be located south of town in the vicinity of the <br />proposed Lyons Valley Park south of the town at the same hydraulic grade line as the <br />water system at the PRY at 68 psi. <br /> <br />3. Begin a replacement program for all water lines that are less than six inches in <br />diameter with 8-inch lines. In addition, we recommend looping of water mains to and <br />within all future developments. This investment will greatly improve fire flows in the <br />main part of town. <br /> <br />4. Upgrade a portion of the distribution system in the main part of town to connect the <br />existing PRY to the proposed Lyons VaHey Park tank with 12-inch diameter pipe. The <br />line connecting the PRY and the proposed 1 MG tank south of town should be <br />upgraded to a 12 inch. This will require replacing approximately 1550 feet of 4 inch <br />pipe, 450 feet of 6 inch pipe, and 300 feet of 8 inch pipe. There is currently about 550 <br />feet of 12 inch pipe in Fourth Avenue between Railroad Avenue and High Street that <br />will be utilized. The existing 12 inch line in 2nd Avenue (by the High School) will <br />need to be extended about 1200 feet to the proposed new tank). <br /> <br />38 <br />