Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TYPICAL ESTIMATED PROJECT COSTS <br /> <br />Preliminary Peasibility <br /> <br />$ <br /> <br />25,000.00 <br /> <br />Construction <br /> <br />L,684,%1.00 <br /> <br />Inflation at 20% <br /> <br />:>:>6,992.00 <br /> <br />Contingencies, Legal and <br />Engineering at 30% <br /> <br />505,487.00 <br /> <br />Right-of-way <br /> <br />50,000.00 <br /> <br />Total Project Estimate with 20% <br />Allowance for Inflation <br /> <br />$2,602,440.DO <br /> <br />26 <br />