Laserfiche WebLink
<br />------------------- <br /> <br />,I <br /> <br />N <br />en <br /> <br />r <br /> <br />NORTH POUDRE IRRIGATION COMPANY RESERVOIR NO. 15 <br /> <br />Summary Chart of Construction Estimate Alternates <br /> <br />Alternate Construction Estimate Construction Estimate <br /> with 30" Riprap and with 36" Riprap and <br />No. Description 12" Filter Gravel 18" Filter Gravel <br /> - <br />A. 3:1 Upstream Slope - $1,320,167.00 $1,437,536.00 <br /> New Outlet <br />B. 3J,:1 Upstream Slope - $1,420,574.00 $1,557,914.00 <br /> New Outlet <br />C. 4:1 Upstream Slope - $1,526,285.00 $1,684,961.00 <br /> New Outlet <br />D. 3:1 Upstream Slope - $ 993,119.00 $1,110,488.00 <br /> Repair Existing Outlet <br />E. 3J, :'1 Upstream Slope - $1,096,626.00 $1,233,966.00 <br /> Repair Existing Outlet <br />F. 4:1 Upstream Slope - $1,194,537.00 $1,353,213.00 <br /> Repair Existing Outlet <br />