My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00151
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:02:00 AM
Creation date
10/5/2006 11:40:41 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153449
Contractor Name
North Poudre Irrigation Company
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
HB 85-1042
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />CHAPTER IV - WATER <br /> <br />I <br /> <br />Reservoir No. IS is filled by diversion out of the North Fork of <br />the Cache La Poudre River. <br /> <br />I <br /> <br />Water Rights <br /> <br />I <br /> <br />North Poudre Reservoir No. IS has a filling decree to gage rod 42.2 <br />feet for 5,463 acre feet of storage with a priority date of April <br />9, 1909 and priority number being 102. <br /> <br />I <br /> <br />I <br />I <br /> <br />Tn addition, The North Poudre Irrigation Company has a refill decree <br />for 4,591 acre feet of this storage dated September 31, 1924 and <br />a conditional refill decree for the bal<Jnce of the Reservoir <br />capacity. Copies of these decrees are included in Appendix "C". <br /> <br />I <br /> <br />Water Quality <br /> <br />I <br /> <br />The water stored in Reservoir No. 15 is basically runoff from high <br />mountain diversions and is of excellent quality. Reservoir No. IS <br />is used extensively resulting in a continual turnover of water with- <br />in the Reservoir and no appreciable build up of salts. <br /> <br />I <br /> <br />I <br /> <br />There are no major sources of pollution upstream of Reservoir No. IS <br />which would induce chemicals or impurities into this water. <br /> <br />I <br /> <br />Reservoir Operation <br /> <br />I <br /> <br />I <br /> <br />Reservoir No. IS is filled by surface rights out of the North Pork <br />of the Cache La Poudre River, Park Creek, and Dry Creek. The <br />drainage basin above Reservoir No. IS is relatively small and most <br />inflows are diverted by means of lbe North Poudre Canal into the <br />Reservoir. <br /> <br />I <br />I <br /> <br />The location of Reservoir No. 15 1S such that 75% of The North <br />Poudre Irrigation Company system lies below the Reservoir. This <br /> <br />I <br />I <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.