Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br /> <br />Three alternatives for expanding the saddle reservoir v.'ere considered: <br /> <br />I. the no.action alternative, <br />construct new west dam and maim:.tin the existing reservoir elevation. and <br />3. construct new west dam and raise the cast dam. thereby increasing the reservoir elevation. <br /> <br />, <br /> <br />Allernatil'e ,No. J was considered unacceptable because it doesn't allow Bill and Barton Poner to <br />stOre their full adjudicated water right, thereby preventing increased crop and livestock <br />production. <br /> <br />Alternutil't! No.2 was ruled out because regional topography is not conducive for feasibly <br />increasing the reservoir [0 the desired storage volume. <br /> <br />AI/emu/h,t! 1\'0. J was selected, since it is considered to be the least co::itly and most reliable <br />approach of achieving the project design objectives. <br /> <br />Selected Altcrnatiyc <br /> <br />The selected alternative. Alternali~'e No.3, involves construction of a new 83.5.foot high West <br />dam approximately 280 feet downstream of the existing \\'est darn. and removal of the existing <br />structure. The existing east dam will be raised 28 feet. A new outlet \....orks and spillway in the <br />west dam \.','ill also be constructed. <br /> <br />Golder Associates Inc. (Golder) prepared engineering designs and cost estimates for the project. <br />These plans were included with the Colorado Water Conservation Board (eWCB) lo:m <br />application. A copy oflhe C\\'eB loan application is included for reference in Appendix B. The <br />estimated cost of the completed project is $2 million. The cost breakdown is summ::J.rizcd in <br />Table 3. The design report prepared by Golder was also included with the previously submitted <br />C\VCB loan application. <br /> <br />Table 3. Barton Porter Resel"\'oir Expansion - Detailed Cost Estimate <br /> <br />hem Estimated Unit Unit Estimated <br /> Quantity Price Amount <br />MOBILIZA TIONIDEMOBILIZA nON 1 L5 1$5.000 55.000 <br />Western Dam Embankment <br />Water Diversion and Control I L5 5'00 5200 <br />Clearing. Grubbing and Striooing 17.76 AC 5500 $8.880 <br />Removal of Existing Outlet Works 1 L5 5400 $400 <br />Foundation Preparation 5.46 AC $400 52.184 <br />Existing Piezometer and Inclinometer Removal I L5 $100 $100 <br />Common Excavation 238.570 CY $0.80 S 190.856 <br />Kev Trench Exca\.ation 2_035 CY $0.80 $1.6~8 <br />Rock Spillway Excavation 21.136 CY $5.50 $116.248 <br />SpillwJ\-/Access Road Excavation I 10.500 CY $0.80 $8.400 <br /> <br />BHlandBV1onPono:r <br />Rcs.cOOlr F.~pamjon f~35ibilit) Sllld~ <br />AU!!lL~11001 <br />1 .":~~-';N>!')(>o].OI'DZJ:HI 0)01 0??6Oo DOC <br /> <br />Pag~ 7 of 13 <br />