My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00149
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:09 AM
Creation date
10/5/2006 11:39:32 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0033X
Contractor Name
Fruitland Mesa Project 1960
Contract Type
Miscellaneous
Water District
0
County
Gunnison
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. S~mRY SHEETS (Continued) <br /> BENEFIT-COST AilALYSES (Unit--$l,OOO) <br /> Fish and 1fildlife <br /> Irri- Jvliti- Enhance- Sub- Recre - <br /> gation gat ion nent ~ stion ~ <br /> Project investment <br /> Construction costsl! $25,054 $960 $678 $1,638 $100 $26,792 <br /> Interest duril1[l <br /> construction 3.,086 42 13 55 1,141 <br /> Costs of mitigation 3.,002 -1,002 -1,~02 <br /> Total 27,142 0 691 91 roo 27,933 <br /> 50-year period of analysis <br /> Average annual <br /> equivalent costs <br /> Project investmentg( 95"(.0 24.4 24.4 5.4 986.8 <br /> O&M costs 43.0 3.0 46.0 <br /> Colorado River stori/ <br /> age project costs3 56.2 56.2 <br /> Total 1,056.2 24.'Ti 24.4 B:4 1,089.0 <br /> Benefits <br /> Direct benefits 296.9 31.0 31.0 38.4 366.3 <br /> Indirect benefits 368.5 368.5 <br />. PLlblic benefits 159.2 159.2 <br />Total 1324.6 3Di 3T.O 31j.4 tl94.0 <br /> Benefit-cost ratios <br /> Direct benefits only 0.28:1 1.64:1 1.64:3. 4.57:1 0.34:1 <br /> Total benefits 0.78:1 1.64:1 1.64:1 4.57:1 0.87:1 <br /> lOO-year period of analysis <br /> <br />Average annual <br />equiva1.ent costs <br />Project investmentg/ <br />O&M costs <br />Colorado River Stor;! <br />age project costs~ <br />Total <br />Benefits <br />Direct benefits <br />Indirect benefits <br />Public benefits <br />Total <br />Benefit-cost ratios <br />Direct benefits only 0.36:1 1.64:1 1.64:1 4.57:1 0.43:1 <br />Total benefits 1.01:1 1.64:1 1.64:1 4.57:1 1..06:1 <br />!I Excludes expenditure of $333,000 for investigations prior to <br />authorization. <br />g/ Costs amortized at 2.5 percent. <br />over 25-year period. <br />l! Cost based on $2 for each acre-foot of average annual increase <br />in project stream depletion. <br /> <br /> <br />. <br /> <br />741. 2 <br />43.0 <br /> <br />18.9 <br /> <br />5.4 <br />3.0 <br /> <br />765.5 <br />46,0 <br /> <br />18.9 <br /> <br />56.2 <br />840.4 <br /> <br />B:4 <br /> <br />56.2 <br />1j67.7 <br />374.9 <br />380.0 <br />163.8 <br />918.7 <br /> <br />18.9 <br /> <br />18.9 <br /> <br />305.5 <br />380.0 <br />163.8 <br />1:349.3 <br /> <br />38.4 <br /> <br />31.0 <br /> <br />31.0 <br /> <br />31.0 <br /> <br />31.0 <br /> <br />3K4 <br /> <br />Recreational costs amortized <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.