My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00147
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00147
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2010 3:06:24 PM
Creation date
10/5/2006 11:39:18 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153637
Contractor Name
North Poudre Irrigation Company
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
SB 92-87
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Item <br /> <br />Chapter I: <br />A. <br />B. <br />C. <br /> <br />FEASIBILITY STUDY FOR RESERVOIR NO. 5 AND NO. 6 <br />TABLE OF CONTENTS <br /> <br />GENERAL INFORMATION <br />Project Map <br />Location <br />Climate <br /> <br />Chapter IV: WATER <br />A. Water Rights <br />B. Water Utilization <br />C. Firm Yield <br />D. Water Quality <br /> <br />Chapter V: <br />A. <br /> <br />B. <br /> <br />PLAN OF DEVELOPMENT <br />Reservoir No. 6 <br />A.1. Physical Plan <br />A.2. Geotechnical Investigations <br />A.3. Soil And Rock Description <br />A.4 Geology <br />A.5. Seismological Considerations <br />A.6. Geotechnical Evaluation <br />A.7. Hydrologic And Hydraulic Evaluation <br />A.8. Structure Plans <br />A.9. Drainage <br />A.10. Sedimentation <br />A.11. Right-Of-Way <br />Reservoir No. 5 <br />B.l. Physical Plan <br />B.2. Further Investigations <br />Miscellaneous Alternatives <br /> <br />C. <br /> <br />Chapter VI: ESTIMATED COSTS <br />A. Costs of Construction <br />A.1. Reservoir No.6 Dam <br />A.2. Reservoir No. 6 Retaining Dike <br />A.3 Reservoir No.5 Dam <br />A.4. Miscellaneous <br />B. Total Project Cost <br />C. Fund Requirement Schedule <br /> <br />Chapter VII: PROJECT EVALUATION <br />A. General <br />B. Financial Evaluation <br />B.l. Minimum Recommended <br />B.2. Maximum Recommended <br />B.3. Project Value <br />Summary <br />C.l. <br />C.2. <br />C.3. <br />C.4. <br /> <br />Rehabili tation <br />Rehabili tation <br /> <br />C. <br /> <br />Project <br />Project <br />Payment <br />Use <br /> <br />Cost <br />Need <br />Capacity <br /> <br />TC-1 <br /> <br />Page No. <br />I-I <br />I-1 <br />1-1 <br />IV-l <br />IV-4 <br />IV-4 <br />IY-5 <br />V-1 <br />V-I <br />V-2 <br />V-3 <br />V-4 <br />V-6 <br />V-9 <br />V-9 <br />V-9 <br />V-14 <br />V-15 <br />V-15 <br />V-17 <br />V-17 <br />V-18 <br />V-19 <br />VI-l <br />VI-1 <br />VI-2 <br />VI-3 <br />VI-4 <br />VI-4 <br />VI-6 <br />VII-1 <br />VII-3 <br />VII-3 <br />VII-4 <br />VII-5 <br />VII-5 <br />VII-5 <br />VII-6 <br />VII-6 <br />VII-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.