My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00146
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00146
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2010 8:43:18 AM
Creation date
10/5/2006 11:39:12 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150011
Contractor Name
Consolidated Mutual Water Company, The
Contract Type
Loan
Water District
7
County
Jefferson
Bill Number
SB 99-173
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />portions of the cities of Lakewood and Wheat Ridge. Some of the major characteristics of <br />the Company are summarized in Table I. <br /> <br />Table 1. Consolidated Mutual, Selected Characteristics <br /> <br />Service Area Population 85,000 <br />Number of Taps 20 000 <br />Total Avg. Annual Demand (Ac-Ft) 12,600 <br />Avg. Monthlv Residential Water Bill . $32.00 <br />Est. 1990 Median Household Income $34,000 <br /> <br />The Company has two service areas: (1) a Denver Contract Service Area utilizing treated <br />water purchased from the Denver Water Department and (2) the Maple Grove Service <br />Area utilizing diversions from Clear Creek and raw water purchased from Denver. The <br />two service areas are shown on Figure I. <br /> <br />The Maple Grove system includes two existing raw water reservoirs with a combined <br />capacity of2,000 acre-feet and a water treatment plant, and provides service to an <br />estimated population of27,000. Three thousand six hundred acre-feet were supplied to <br />the area in 1997. The proposed Fortune Reservoir is intended to provide raw water <br />storage for the Maple Grove Service Area. <br /> <br /> <br />In 1997, Consolidated submitted an acceptable water conservation plan as required by <br />HB 1154. <br /> <br />Water Ri!!hts <br /> <br />The Company has an extensive portfolio of junior and senior Clear Creek water rights, <br />which provide the bulk of the water supply for the Maple Grove system. The estimated <br />average annual yield of the Clear Creek rights for the years 1986 to 1996 was about 5,300 <br />acre-feet. In addition, the Company has a contract with the Denver Water Department for <br />443 acre-feet per year ofraw water for the Maple Grove service area. <br /> <br />Need for the Proiect <br /> <br />Under dry-year conditions, current Maple Grove area demands would be slightly in <br />excess of the safe annual yield of the system; by the year 2020 the supply/demand deficit <br />is expected to be about 1,700 acre-feet. The new reservoir would provide additional <br />operational and seasonal storage as well as carry-over storage to significantly increase the <br />firm annual yield of the Company's existing water rights. The additional storage capacity <br />is expected to result in adequate water supplies through build-out ofthe Maple Grove <br />service area. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.