My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00143
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00143
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 10:54:06 AM
Creation date
10/5/2006 11:39:01 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153810
Contractor Name
Wood Lake Mutual Water & Irrigation Company
Contract Type
Loan
Water District
1
County
Weld
Bill Number
SB 97-008
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />IMPLEMENT A TION SCHEDULE <br /> <br />The following schedule is proposed for implementation of the project: <br /> <br />Task <br /> <br />Target Completion Date <br /> <br />I. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br /> <br />Feasibility Study <br />Design <br />SEO Design Review <br />Bid <br />Award Bid <br />Start Construction <br />Project Complete <br /> <br />2/1/97 <br />7/15/97 <br />2/1198 <br />7/1198 <br />8/1 /98 <br />9/1198 <br />12/15/98 <br /> <br />SOCIAL, ECONOMIC, AND PHYSICAL IMPACTS <br /> <br />The project will have no significant social impacts. <br /> <br />The project will have a positive economic impact providing irrigation water for 1,829 acres of <br />shareholders' crops. Loss ofrevenue if irrigation is lost is estimated at $435 per acre for a total <br />loss of $795,156 per year from the 1,829 irrigated acres. <br /> <br />The project will have no significant physical impacts. <br /> <br />PERMITTING <br /> <br />The Company does not own the land which contains the saddle dam and arrangements will have <br />to be made with Mr. and Mrs. Mike Guttersen who own the property and who are also <br />stockholders in the Company. The Company owns the property in the area of the main dam and <br />we do not anticipate problems with right-of-way for the work on the main dam and spillway. <br /> <br />The company and the Engineer believe no Environmental Assessment (EA) or Environmental <br />Impact Statement (EIS) will be required. The Corps of Engineers will be contacted concerning <br />404 permitting but anticipate the work faIling under the Nation Wide Permits which will not <br />require formal permitting. <br /> <br />FINANCIAL PLAN <br /> <br />Sources of financing for the project consist a $188,000 loan from the Colorado Water <br /> <br />Woods Lake Feasibility <br /> <br />Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.