Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE OF CONTENTS <br /> <br />Twin Lakes Dam & Reservoir <br />Page 4. <br /> <br />PAGE <br /> <br />5.2.4 Earth Dike Embankment 77 <br />5.2.5 Outlet Works and Service Spillway 78 <br />5.3 Stability of RCC Dam 78 <br />5.4 Stability of Earth Dike 82 <br />5.5 Seepage Analysis 83 <br /> <br />CHAPTER V I: ESTIMATED COSTS 84 <br /> 1.0 Summary of Project Costs 84 <br /> 1.1 Cost of Feasibility Study 84 <br /> 1.2 Estimated Cost of Construction 86 <br /> 1.3 Construction Contingency 86 <br /> 1.4 Cost of Engineering and Construction 86 <br /> Management <br /> 1.5 Project Price Increase 88 <br /> 1.6 Interest During Project Execution 88 <br /> 2.0 Fund Requirement Schedule 89 <br /> 3.0 Operation, Maintenance, and Replacement 89 <br /> 4.0 Emergency Operating Fund 90 <br /> 5.0 Unit Costs per Acre-Foot 90 <br />CHAPTER V II : PROJECT EVALUATION 92 <br /> 1.0 Payment Capacity 92 <br /> 2.0 Alternative Sources of Supply 94 <br /> 3.0 Additional Project Benefits 95 <br />CHAPTER V II I : FINANCIAL PROGRAM 97 <br /> 1.0 Project Costs 97 <br /> 2.0 Financing 98 <br /> 3.0 Revenues 98 <br /> 4.0 Pay-Out Schedule 98 <br />