My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00137
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00137
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:09 AM
Creation date
10/5/2006 11:38:26 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153467
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
0
County
Weld
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE OF CONTENTS <br /> <br />Twin Lakes Dam & Reservoir <br />Page 4. <br /> <br />PAGE <br /> <br />5.2.4 Earth Dike Embankment 77 <br />5.2.5 Outlet Works and Service Spillway 78 <br />5.3 Stability of RCC Dam 78 <br />5.4 Stability of Earth Dike 82 <br />5.5 Seepage Analysis 83 <br /> <br />CHAPTER V I: ESTIMATED COSTS 84 <br /> 1.0 Summary of Project Costs 84 <br /> 1.1 Cost of Feasibility Study 84 <br /> 1.2 Estimated Cost of Construction 86 <br /> 1.3 Construction Contingency 86 <br /> 1.4 Cost of Engineering and Construction 86 <br /> Management <br /> 1.5 Project Price Increase 88 <br /> 1.6 Interest During Project Execution 88 <br /> 2.0 Fund Requirement Schedule 89 <br /> 3.0 Operation, Maintenance, and Replacement 89 <br /> 4.0 Emergency Operating Fund 90 <br /> 5.0 Unit Costs per Acre-Foot 90 <br />CHAPTER V II : PROJECT EVALUATION 92 <br /> 1.0 Payment Capacity 92 <br /> 2.0 Alternative Sources of Supply 94 <br /> 3.0 Additional Project Benefits 95 <br />CHAPTER V II I : FINANCIAL PROGRAM 97 <br /> 1.0 Project Costs 97 <br /> 2.0 Financing 98 <br /> 3.0 Revenues 98 <br /> 4.0 Pay-Out Schedule 98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.