My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00137
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00137
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:09 AM
Creation date
10/5/2006 11:38:26 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153467
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
0
County
Weld
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE OF CONTENTS <br /> <br />Twin Lakes Dam & Reservoir <br />Page 3. <br /> <br />PAGE <br /> <br />3.0 Hydrology and Hydraul ics 56 <br />3.1 Probable Maximum Flood 56 <br />3.2 Flood Routing 57 <br />3.3 Outlet Works 60 <br />3.4 Dam Breach Analysis 61 <br />4.0 Rehabilitation Alternatives 62 <br />4.1 Technical Alternatives 62 <br />4.2 Cost Estimates 68 <br />4.3 Alternative Selected for Feasibility 68 <br />Design <br />4.4 Alternatives for Transfer of Twin Lakes 69 <br />Reservoir <br />4.4.1 Enl argi ng Peterson Dam and 69 <br />Reservoir <br /> <br />4.4.2 Enlarging Comanche Dam and <br />Reservoir <br />5.0 Feasibility Design 70 <br />5.1 Design Criteria 70 <br />5.1.1 Foundation Design Criteria 70 <br />5.1 .2 RCC Oam Stabi 1 i ty Cri teri a 71 <br />5.1.3 RCC Dam Desi gn Assumpti ons 71 <br />5.1.4 Earth Dike Embankment Stability 72 <br />Cri teri a <br /> <br />70 <br /> <br />5.1.5 Earth Dike Embankment & Foundation 72 <br />Filter and Drainage Criteria <br />5.1.6 Outlet Works Design Criteria 73 <br />5.1. 7 Spillway Design Criteria 73 <br />5.2 Design Descriptions 74 <br />5.2.1 RCC Dam Foundation 74 <br />5.2.2 RCC Dam 77 <br />5.2.3 Earth Dike Foundation 77 <br />
The URL can be used to link to this page
Your browser does not support the video tag.