My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FS0025X Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
FS0025X Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2014 4:25:13 PM
Creation date
10/5/2006 11:37:46 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0025X
Contractor Name
Upper Gunnison Uncompahgre Basin CWRPDA 1989
Contract Type
Loan
Water District
0
County
Archuleta
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
803
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
concerted effort on the part of the local citizens, the CDOW and <br />Colorado congressional delegation. Use of these funds for this <br />project would also require approval of the CDOW. <br />o Land Sales. The sale of property around the proposed Tomichi Creek <br />Reservoir and/or collection of lease fees from landowners near the <br />reservoir offers another potential source of funds for project --- <br />development. This has not been evaluated in this study. <br />o Federal Fundina Although not considered as a source of financing in <br />this phase of the Study, a potential source af project funding that <br />should be considered in future phases of this phase of the Study is <br />appropriated federal funds. Such funds may be available for a <br />project that is regional in nature such as an east-west slope <br />cooperative development to provide water to a variety of users and <br />also that provides outdoor recreation opportunities. <br />7=6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.