My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FS0025X Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
FS0025X Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2014 4:25:13 PM
Creation date
10/5/2006 11:37:46 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0025X
Contractor Name
Upper Gunnison Uncompahgre Basin CWRPDA 1989
Contract Type
Loan
Water District
0
County
Archuleta
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
803
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Preliminary evaluation of these components resulted in retaining the Ohio <br />Creek site, the two Cochetopa sub-basin sites, and two of the five sites in <br />the Tomichi sub-basin; Sargents No. 3 and Elko. The two Cochetopa sites and <br />the two Tomichi sites that were retained for further study exhibit advantages <br />and disadvantages that make a definite choice between them very difficult at <br />this level of study. <br />The major project features and preliminary cost estimates for each of <br />these five potential storage reservoirs is presented in Table 5.3. All of <br />these potential reservoirs would be formed by earthfill embankment dams with <br />ungated spillways and multilevel outlet works. Preliminary project layout <br />drawings are shown in Figures 5.2 through 5.6. <br />�] <br />
The URL can be used to link to this page
Your browser does not support the video tag.