My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FS0025X Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
FS0025X Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2014 4:25:13 PM
Creation date
10/5/2006 11:37:46 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0025X
Contractor Name
Upper Gunnison Uncompahgre Basin CWRPDA 1989
Contract Type
Loan
Water District
0
County
Archuleta
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
803
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Instream flow demands were represented in this evaluation by the decreed <br />CWCB and private instream flow water rights in the basin. Whenever the <br />streamflow in a reach was less, on an average monthly basis, than the decreed <br />instream flow rate, a deficiency was said to exist. Such deficiencies were <br />observed on many of the stream reaches covered by existing CWCB instream flow <br />decrees, but most were minor. The most severe of these deficiencies were <br />found on lower Ohio Creek, lower Tomichi Creek, and an Cochetopa Creek -- <br />upstream of the confluence with Los Pinos Creek. Large deficiencies to the <br />relatively junior private instream flow decree below Taylor Park Dam are <br />frequent, but flow conditions regularly satisfy the CWCB decree in that reach. <br />An instream flow target of 300 cfs was included in the model for the <br />Gunnison River through the Black Canyon. As discussed in Section 3.5, this <br />water was assumed to be supplied by Blue Mesa releases whenever normal Blue <br />Mesa operations did not provide the minimum flow level. The 300 cfs minimum <br />was met in all months of the 32-year study period, requiring an annual average <br />Blue Mesa storage release of 22,000 af specifically for that purpose. Blue <br />Mesa Reservoir levels never went below minimum power pool for the Na-Action <br />Alternative. <br />4-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.