My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153166 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153166 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:08 AM
Creation date
10/5/2006 11:37:41 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153166
Contractor Name
Rico, Town of
Contract Type
Loan
Water District
0
County
Dolores
Bill Number
SB 77-35
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Physical Plan <br /> <br />structure will be used for industrial "ater which is taken out 1.200 feet <br />belo,l the existing intake. ',)I <br />The proposed pond will act as a clarifier as well as serving for <br />raw...'ater storage. Its capacity is 222.350 gallons. It will have a <br />six inch outlet for Rico's water supply and a twelve inch overflow to <br />regulate the water level. The inlet ditch should be designed and <br />constructed to allow no more than 3.0 c.f.s. into the pond. It will <br />be necessary to construct the di teh out of concrete and provide an <br />emergency overflou back to Silver Creek for any excessive flows. This <br />will prevent the pond from overflowing. The pond shou:Jd be protected <br />from flood flo\1s by rip rap on the upper end. Also, the pond should be <br />placed tHO feet above the 100 year flood line. <br />
The URL can be used to link to this page
Your browser does not support the video tag.