Laserfiche WebLink
<br />Physical Plan <br /> <br />structure will be used for industrial "ater which is taken out 1.200 feet <br />belo,l the existing intake. ',)I <br />The proposed pond will act as a clarifier as well as serving for <br />raw...'ater storage. Its capacity is 222.350 gallons. It will have a <br />six inch outlet for Rico's water supply and a twelve inch overflow to <br />regulate the water level. The inlet ditch should be designed and <br />constructed to allow no more than 3.0 c.f.s. into the pond. It will <br />be necessary to construct the di teh out of concrete and provide an <br />emergency overflou back to Silver Creek for any excessive flows. This <br />will prevent the pond from overflowing. The pond shou:Jd be protected <br />from flood flo\1s by rip rap on the upper end. Also, the pond should be <br />placed tHO feet above the 100 year flood line. <br />