My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153166 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153166 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:08 AM
Creation date
10/5/2006 11:37:41 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153166
Contractor Name
Rico, Town of
Contract Type
Loan
Water District
0
County
Dolores
Bill Number
SB 77-35
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />the remaining pipe in the ground ,;Ilich dat es b'tck to the 1880' s; this <br /> <br /> <br />pipe is nearly 100 years old and was not installed at a proper depth <br /> <br /> <br />from the beginning. Also, the water source, which is 10catsd about <br /> <br /> <br />one and one-haJj miles above Rico on Silver Cx'eek, has proved to be <br /> <br /> <br />undependable for various reasons. In lo-,T flow periods which occur <br /> <br /> <br />during the months of Septembera1ld October, the suppJ,y dwindles to a <br /> <br /> <br />minimlun. Tills creates water shortage problems during these periods. <br /> <br /> <br />In addition, the source has provsd undependable in cert2in winter <br /> <br /> <br />conditions due to icing and has even been curtailsd due to sno,; <br /> <br />avalanche. A ffffN years ago, an avalanche blocked the flow of the <br /> <br />wa tel' above the intake for two days. This stoppage caused the town's <br /> <br />lines to freeze so that service 'Was not able to be resumed until the <br /> <br />follOwing spring. <br /> <br />n <br />
The URL can be used to link to this page
Your browser does not support the video tag.