Laserfiche WebLink
<br />< <br /> <br />. <br /> <br />. <br /> <br />, <br /> <br />Mr. Nick loannidcs <br />May 22, 1978 <br />Page 2 <br /> <br />REMUNERATION <br /> <br />Investigative Report <br /> <br />It is proposed that the Investigative Report wi 11 bc prepared on an hourly <br />rate basis plus out of pocket expenditures with a maximum cost to CWCB of <br />$4,500. The attached hourly rate schedule will be utilized. <br /> <br />Post Report Work <br /> <br />As the scope of work is undefined, no fee limits can be established for <br />this phase; therefore. we would propose that this work be accomplished <br />on an hourly rate basis plus out of pocket cxpenditures in accordance with <br />the attached rate schedule. If possible, we will establish maximum fees <br />on an assignment by assignment basis. <br /> <br />NOTIFICATION <br /> <br />Prior to commencing work on this assignment, Wright-McLaughlin Engineers <br />wi 11 notify the consulting engineer for the Rangley Water Treatment Plant <br />that our fi rm ,.d 11 be revie"ling thei r work, <br /> <br />You may indicate acceptance of this Proposal by signing in the space <br />provided below and returning one copy to this office, <br /> <br />Very truly yours, <br /> <br />WRIGHT-McLAUGHLIN ENGINEERS <br /> <br />~----. ,,' ___-::0...:-.. <br />By '\)' ~, /, I -" ~ ~~~, , <br />/~.<-n..~,_'" f-;t , '..J-z-rc...;. .,~ <br />.---- Dougla~ T, Sovern <br />'/ <br /> <br />DTS/nl <br />Enclosure <br /> <br />ACCEPTED BY: <br /> <br />Da te: <br /> <br />Title: <br />