Laserfiche WebLink
<br />< <br /> <br />.. APPENDIXA <br />~HT-MCLAUGHLlN ENGINEER. <br />ENGINEERING CONSULTANTS <br /> <br />COMPLETE ENGINEERING SERVICES <br />IN THI': THE spr:CtALTV ,FIELDS or <br /> <br />, <br /> <br />RONALD C 'M~' "H.HLtN <br />KEN-NErH R W'{IGHT <br />. HALI'CRD E ERICKSON <br />DOUGLjl,5 T SDVERN <br />WILLIAM C rAr;GI\RT <br />THOM...., W MORRIS <br /> <br />JIMMIE 0 WHlTni::LO <br />JOHN T McLANE <br />CAVID J LOYE <br />l:lONALO B CLONINGER <br /> <br />2420 "LeOTT STJtF.ET <br />OENVER, COLO~"'DO 00211 <br />,3D3,4511'45101 <br /> <br />WATER SUPPLY AND DISTRIBUTION <br />WATER I\.ND SEWAGE TREATMENT <br />SEWAGE COLLECTION AND REUSE <br />STORM DR,o,IN"GE <br />FLOOD CONTROL AND <br />OTHER W..TER-ORIEN!EO PROJECTS <br /> <br />May 22, 1978 <br /> <br />m~(C1~--'rr '''''\. ~-, <br />t;' i r;.j \~,i t.; ,I n <br />U "'I <O""lli'\d c.J~' <br />f I L. ~- ,._.Li.. L ' .L' .., I <br />i( .. , .. "-~ I, <br />,:.1 flw ,II, <br />:::',' '1\1 2.21978 ruJll <br />.1L., I, <br />LJI........:-_ ,- <br />COL.O, \';.HER <br />CO'!SE;(','A T!OrJ 80ARD <br /> <br />Mr. Nick loannides <br />Colorado Water Conservation Board <br />1313 Sherman Street <br />Denver, Colorado 80203 <br /> <br />RE: Rangley Water Treatment Plant <br />Proposal <br /> <br />Dear Nick: <br /> <br />As requested, we are submitting the following Proposal to review the per- <br />fo'rmance and the operation of the Rangley Water Treatment Plant, and to <br />subsequently write a short report of our findings and conclusions. Addition- <br />ally, the Proposal contains provisions for additional work related to <br />potential settlements or court actiOns, <br /> <br />PROPOSAL <br /> <br />SCOPE OF WORK <br /> <br />The scope of work is divided into two phases: <br /> <br />Investigative Report <br /> <br />Wright-McLaughlin Engineers will review the design drawings on the Rangley <br />Water Treatment Plant (including appurtenances), ",ater qual ity data of <br />influent and effluent, diversion and plant production data, and other <br />pertinent data. After such review, our personn~l will visit the Rangley <br />Plant to conduct tests and to discuss the apparent problems with the Plant <br />operator and others as may seem appropriate. <br /> <br />Upon completion of the plan review and physical inspection, the Consultant <br />will prepare a short report of the findings,and potential remedial measures, <br />The report will be furnished to CWCB with ten (10) copies, <br /> <br />Post Report Work <br /> <br />As requested, the Consultant wil I remain available to provide consul- <br />tation during negotiations or possible future court actions, <br /> <br />Personnel <br /> <br />I t is expected that D,.,u~las T, Sovern and Robert <br />are attached, wi 11 bc; assigned to this project. <br />will be used as needed~ <br /> <br />L, Carley, whose resumes <br />Other ..nior personnel <br /> <br />APPENDIX A <br /> <br />BRANCH OFFICES <br />"'SPE" <br />"''' ....~. "'",,, <br /> <br />OILlON L"'~E <br />p.... "n-..: 1 ,." <br /> <br />GLFNWOOo SPRINGS <br />PO BO)( \286 <br />G'.F"lWt'On '::I'RI"IC,C;. <br /> <br />STE....'-lBO....T SPI'llNG5 <br />P.O BOl( ~n_Q <br />f>TEAo.lA"'T VIII .:::;<:. <br /> <br />LEIoO/oEAOWOOD <br />t}J SHERM"N <br />OFArWQr>r> <br />