<br /><
<br />
<br />.. APPENDIXA
<br />~HT-MCLAUGHLlN ENGINEER.
<br />ENGINEERING CONSULTANTS
<br />
<br />COMPLETE ENGINEERING SERVICES
<br />IN THI': THE spr:CtALTV ,FIELDS or
<br />
<br />,
<br />
<br />RONALD C 'M~' "H.HLtN
<br />KEN-NErH R W'{IGHT
<br />. HALI'CRD E ERICKSON
<br />DOUGLjl,5 T SDVERN
<br />WILLIAM C rAr;GI\RT
<br />THOM...., W MORRIS
<br />
<br />JIMMIE 0 WHlTni::LO
<br />JOHN T McLANE
<br />CAVID J LOYE
<br />l:lONALO B CLONINGER
<br />
<br />2420 "LeOTT STJtF.ET
<br />OENVER, COLO~"'DO 00211
<br />,3D3,4511'45101
<br />
<br />WATER SUPPLY AND DISTRIBUTION
<br />WATER I\.ND SEWAGE TREATMENT
<br />SEWAGE COLLECTION AND REUSE
<br />STORM DR,o,IN"GE
<br />FLOOD CONTROL AND
<br />OTHER W..TER-ORIEN!EO PROJECTS
<br />
<br />May 22, 1978
<br />
<br />m~(C1~--'rr '''''\. ~-,
<br />t;' i r;.j \~,i t.; ,I n
<br />U "'I <O""lli'\d c.J~'
<br />f I L. ~- ,._.Li.. L ' .L' .., I
<br />i( .. , .. "-~ I,
<br />,:.1 flw ,II,
<br />:::',' '1\1 2.21978 ruJll
<br />.1L., I,
<br />LJI........:-_ ,-
<br />COL.O, \';.HER
<br />CO'!SE;(','A T!OrJ 80ARD
<br />
<br />Mr. Nick loannides
<br />Colorado Water Conservation Board
<br />1313 Sherman Street
<br />Denver, Colorado 80203
<br />
<br />RE: Rangley Water Treatment Plant
<br />Proposal
<br />
<br />Dear Nick:
<br />
<br />As requested, we are submitting the following Proposal to review the per-
<br />fo'rmance and the operation of the Rangley Water Treatment Plant, and to
<br />subsequently write a short report of our findings and conclusions. Addition-
<br />ally, the Proposal contains provisions for additional work related to
<br />potential settlements or court actiOns,
<br />
<br />PROPOSAL
<br />
<br />SCOPE OF WORK
<br />
<br />The scope of work is divided into two phases:
<br />
<br />Investigative Report
<br />
<br />Wright-McLaughlin Engineers will review the design drawings on the Rangley
<br />Water Treatment Plant (including appurtenances), ",ater qual ity data of
<br />influent and effluent, diversion and plant production data, and other
<br />pertinent data. After such review, our personn~l will visit the Rangley
<br />Plant to conduct tests and to discuss the apparent problems with the Plant
<br />operator and others as may seem appropriate.
<br />
<br />Upon completion of the plan review and physical inspection, the Consultant
<br />will prepare a short report of the findings,and potential remedial measures,
<br />The report will be furnished to CWCB with ten (10) copies,
<br />
<br />Post Report Work
<br />
<br />As requested, the Consultant wil I remain available to provide consul-
<br />tation during negotiations or possible future court actions,
<br />
<br />Personnel
<br />
<br />I t is expected that D,.,u~las T, Sovern and Robert
<br />are attached, wi 11 bc; assigned to this project.
<br />will be used as needed~
<br />
<br />L, Carley, whose resumes
<br />Other ..nior personnel
<br />
<br />APPENDIX A
<br />
<br />BRANCH OFFICES
<br />"'SPE"
<br />"''' ....~. "'",,,
<br />
<br />OILlON L"'~E
<br />p.... "n-..: 1 ,."
<br />
<br />GLFNWOOo SPRINGS
<br />PO BO)( \286
<br />G'.F"lWt'On '::I'RI"IC,C;.
<br />
<br />STE....'-lBO....T SPI'llNG5
<br />P.O BOl( ~n_Q
<br />f>TEAo.lA"'T VIII .:::;<:.
<br />
<br />LEIoO/oEAOWOOD
<br />t}J SHERM"N
<br />OFArWQr>r>
<br />
|