My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00130
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00130
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:08 AM
Creation date
10/5/2006 11:37:04 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153382
Contractor Name
Fruita, City of
Contract Type
Loan
Water District
0
County
Mesa
Bill Number
SB 81-439
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />\ <br />\ <br />I <br />! <br /> <br />.: ~ <br /> <br />," <br /> <br />'.' <br /> <br />r-y-C\ <br /> <br />F4,. <br /> <br />SCHEDULE A <br /> <br />COLORADO WATER CONSERVATION BOARD <br />CONSTRUCTION FUND PROGRAM PROCEDURES <br /> <br />L Board dpproval of engineerIng firm dnd engineering <br />agreement between engineering firm dnd project sponsor. <br /> <br />2. Prepdratlon of detailed plans and specifications for <br />d.uthorlzed projects by consulting engineering firm. <br /> <br />3. Appr~val of detailed plans dnd specifications by Board <br />staff (plans and speciflcdtions for stordge dams dnd <br />reservoirs must dlso be dpproved by State Engineer1s <br />office). <br /> <br />4. <br /> <br />BOdrd staff approval of bidding for the project. <br />staff present at bid opening for construction. <br /> <br />BOdrd <br /> <br />5. Project sponsor may issue the notice of a~ard and the <br />notIce to proceed with construction to the contractor <br />(both notices must be approved by the Board staff before <br />they are issued). <br /> <br />6. <br /> <br />Conduct a pre-construction conference. <br />construction scheduie by BOdrd staff. <br /> <br />Approval of <br /> <br />7. Construction commences. The BOdrd stafr makes periodic <br />inspectIons during construction. All change orders must <br />be approved by the Board staff in .advdnce dnd b~fore dny <br />construction on chdnge items Cdn commence. Emergenc~ <br />items cleared by telephone. <br /> <br />B. The consulting engineer certifies that the project h.as <br />been completed decording to approved drawings dnd <br />specifications dnd arranges for final inspection. <br /> <br />9. Final inspection and acceptance of as-bullt project by <br />BOd.rd stdff. <br /> <br />f <br />10. Submlttdl of.as-built drawings to Board stdff for <br />approval and fIling. <br /> <br />, <br />
The URL can be used to link to this page
Your browser does not support the video tag.