Laserfiche WebLink
<br />r <br /> <br />from the time you no~ us that we have the job - weillLr permitting. Due <br />to these conditions, we will require acceptance of this proposal by October <br />7, 1986 or it is null and void. <br /> <br />-.---. ...,.., Note 2 - Time to complete. 8 - 11 days. (Working. days) <br /> <br />Note 3 - We have located Class 3- 36" R.C.P. in stock and could have it on <br />jobsite in a matter of days. <br /> <br />Note 4 - Any unforseen additional work to be on a negotiated basis agreed <br />to between engineer and contractor. <br /> <br />Note 5 - Payment to be within 2 weeks after completion. If this is not <br />satisfactory, please notify. <br /> <br />Sincerely, <br /> <br /> <br />~ <br /> <br />Ed Tezak, Jr. <br />President <br /> <br />-" <br />