Laserfiche WebLink
<br />~ <br /> <br />.) <br /> <br />. <br /> <br />. <br />., <br /> <br />The estimated cost for preparation of your report is $ 33,400.00 as <br />itemized in the proposal. <br /> <br />We appreciate the opportunity to present our proposal and to work with <br />the Grand Mesa Water Conservancy District, the Colorado River Water <br />Conservation District, and the Colorado Water Conservation Board in an <br />effort to initiate the development and construction of the Grand Mesa <br />Project. With your permission, we will transmit copies of our proposal <br />to each 'of the other two agenc i es, recogn i zing that part i c i pat i on by <br />either or both may be neceSSi'lry to full y fund the study. If the <br />Colorado Water Conservation Board approves this proposal and decides to <br />participate, it may desire to provide a standard fonn of joint contract <br />for execution by your Board and the engineering finn involved. <br /> <br />This proposal does not include preparation of an Environmental <br />Assessment Report or an Env i ronmenta 1 Impact Statement. If either is <br />requi red due 'to the involvement of federal funds or federal lands, the <br />cost of such a report or statement would have to be the subject of a <br />separate cost item. <br /> <br />Very truly yours, <br /> <br />WESTERN ENGINEERS, INC. <br /> <br />z~&~ <br /> <br />Edward J. Cur i r, P.E. <br />President/Gene al Manager <br /> <br />EJC:slv <br /> <br />Enclosure <br />