Laserfiche WebLink
<br />~ <br /> <br />" <br /> <br />. <br /> <br />APPENDIX A <br /> <br />. <br /> <br />? <br /> <br /> <br />~STERN <br />ENGINEERS, INC. <br /> <br /> <br />CONSUL lING ENGINEERS I LAND SURVEYORS <br /> <br />2150 Hwy 6 & 50, a,and Junction. CO 81501 . 303/242-5202 <br /> <br />April 25, 1980 <br /> <br />, fPj I[Df~~~'~[?,W5E~ <br />1/11 Feu 1 C !Ql'? <br /> <br />L.'J t.. '-/u~_ <br /> <br />cOT'J <br />CO;'J'<;:!C~~!!,O WATER <br />~-" d,' 'rill D'JA <br />"_I, C PD <br /> <br />Mr. Herschel G. Burgess, President <br />Grand Mesa Water Conservancy District <br />P.O. Box 36 <br />Cedaredge, Colorado 81413 <br /> <br />Dear Mr. Burgess: <br /> <br />Pursuant to the mot i on adopted DY the Board of Directors of t'he Grand <br />Mesa Water Conservancy District at its meeting held on March 21, 1980 in <br />Cedaredge, Colorado, we are submitting the enclosed proposal for <br />preparation of a report on Phase I of the Grand Mesa Project, the format <br />of which will comply with the regulations and guidelines for loan <br />app I i cat ions to the Co I orado ~Iater Conservat i on Board or the sma 11 <br />Reclamation Projects Program of the Water and Power Resources Service. <br />In preparation of your report, we are anticipating the use of any <br />reports, data, or-other information that may be available from the f.iles <br />of the Water and Power Resources Service, other Federal agencies, the <br />State of Colorado, or other entities. <br /> <br />We propose to investigate, in suitable depth for feasibil ity-type <br />studies, the following specific items: <br /> <br />(a) the availability of a water supply to fill and successfully <br />operate a reservoir in Cactus Park; <br /> <br />(b) a feeder cana I systern to i nc I ude the rehab i I i tat i on and <br />enlargement of the Sooner Ditch, and possibly others, to <br />deliver the available water to Cactus Park; <br /> <br />(c) power generating stations to uti I ize the inflow and drop in <br />elevation into Cactus Park; <br /> <br />(d) surveys, site preparat, ion, and construction of Cactus Park <br />Reservoir; <br /> <br />(e) the possibilities of generation of hydroelectric power <br />downstream from Cactus Park Reservoir, if the results of (a), <br />(b), (c), and (d) above and the water release regime from the <br />reservoir warrant such a study; <br /> <br />(n rehabilitation and reconstruction of existing laterals and <br />ditches with the objective of optimiZing the uses and savings <br />of water from them, particularly in conjunction with the <br />del iveries of water from Cactus Park Reservoir; and <br /> <br />(g) i'nvestigatlon of diverting some water from Tongue Creek for <br />storage in winter months. <br /> <br />APPENDIX A <br />