My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00123
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00123
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2010 11:49:45 AM
Creation date
10/5/2006 11:36:50 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153448
Contractor Name
Colorado River Water Conservation District
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />EXHIBIT IT <br />PLAN OF STUDY <br /> <br />Section 1: Study Objectives <br /> <br />The objectives of the Grand Mesa Water Conservancy District Study are to <br />evaluate and determine the costs and merits of various means of augmenting the <br />irrigation water supplies of the Surface Creek basin near Cedaredge, Colorado. <br />The various means to be studied will include: <br /> <br />1. Identifying the opportunities for improved management of the water <br />resources of the Surface Creek basin. <br /> <br />2. Providing storage in the Surface Creek basin at the Cactus Park or other <br />suitable reservoir site, utilizing the District's conditional water rights to <br />provide supplemental or replacement water supplies for exchanges. <br /> <br />3. Importing supplemental or replacement water supplies for exchanges into the <br />Surface Creek basin from excess flows in the Muddy Creek basin, via the <br />Overland Ditch and Reservoir System. <br /> <br />Several alternative project configurations and capacities will be formulated <br />and evaluated, employing these three means of augmentation. The end product of <br />the study will be a report to the CWCB, CR WCD and GMWCD, summarizing the <br />assumptions, investigations, findings and evaluations made during the study. The <br />report will contain our conclusions and recommendations regarding the costs and <br />merits of the alternative project configurations developed during the study. The <br />report will be prepared for use by the CWCB, CRWCD and GMWCD in planning the <br />future direction of the Project. <br /> <br />Section 2: The Work Plan <br /> <br />The study will be conducted substantially in accordance with the three-steP <br />procedure outlined in the RFP. The bulk of the work will be in the areas of <br /> <br />II-I <br /> <br />Revised 9/23/1985 <br />
The URL can be used to link to this page
Your browser does not support the video tag.