Laserfiche WebLink
<br />TASK NO.: 8 <br />RFP CROSS-REFERENCE: <br />Step 2, Item (4) <br /> <br />STAFF MEMBERS RESPONSIBLE: <br />Hydraulics Specialist <br />Preliminary Designs Specialist <br /> <br />TASK TITLE: <br /> <br />Identification of New Facilities Necessary for Transbasin Diversions. <br /> <br />RATIONALE: <br /> <br />The new facilities necessary to accomplish transbasin diversion of the excess <br />water supplies available to the Overland Ditch and Reservoir system to the <br />Surface Creek basin requires that the necessary new facilities be identified <br />by means of conventional reconnaissance level map and field route studies <br />and appraisal level layouts and design of alternative conveyance systems <br />between the existing Overland Ditch and Surface Creek. <br /> <br />METHODOLOGY: <br /> <br />1. Perform reconnaissance level map location studies to select a feasible route <br />or routes for extension of the Overland Ditch from East Leroux Creek or <br />intermediate point to Surface Creek. <br /> <br />2. Evaluate whether any gravity or pumping pipeline would be a practical <br />alternative to extension of the Overland Ditch. <br /> <br />3. Prepare a large-scale location map of the selected route on a base prepared <br />by photo-reproduction of 1:24,000 scale USGS topographic sheets. <br /> <br />4. Make a field reconnaissance investigation of the tentative route selected in <br />Steps I and 2 above to confirm the practicability of the route and to identify <br />any special situations to be recognized in the layout and design. <br /> <br />5. Perform preliminary hydraulic designs to determine the optimum sizes of the <br />various sections and structures of the selected most feasible transbasin <br />conveyance system. <br /> <br />PRODUCTS: <br /> <br />I. Location map of the most feasible route for extension of the Overland Ditch <br />to Surface Creek. <br /> <br />2. Tabulation and description of the new facilities comprising the selected <br />optimum transbasin conveyance system. <br /> <br />Il-16 <br /> <br />Revised 9/23/1985 <br />