Laserfiche WebLink
<br />TASK NO.: 7 <br />RFP CROSS-REFERENCE: <br />Step 2, Item (3) <br /> <br />STAFF MEMBERS RESPONSIBLE: <br />Hydraulics Specialist <br />Dam Evaluation Specialist <br />System Operation Studies Specialist <br /> <br />TASK TITLE: <br /> <br />Identification of Modifications of the Existing Overland Ditch and Reservoir <br />System Necessary to Accommodate Transbasin Diversions. <br /> <br />RATIONALE: <br /> <br />Enlargements and improvements of the existing Overland Ditch and Reservoir <br />required to accommodate the excess flows available for transbasin diversion <br />to the Surface Creek basin need to be determined by means of integrated <br />analyses of the hydraulic design of the ditch and the operation of the <br />reservoir. <br /> <br />METHODOLOGY: <br /> <br />I. Prepare a large-scale location map of the existing Overland Ditch and <br />Reservoir system on a base prepared by photo-reproduction of 1:24,000 scale <br />USGS topographic sheets. <br /> <br />2. Identify the physical characteristics of the ditch and reservoir and confirm <br />their condition, capacities and other characteristics by field inspection. <br /> <br />3. Perform a hydraulic analysis of the existing ditch system to determine the <br />size of ditch necessary to carry the system demands plus the excess flows <br />identified in Task No.6 available for diversion to the Surface Creek basin. <br /> <br />4. Using an available reservoir operation computer program, operate the Over- <br />land Reservoir model to determine the live capacity required to regulate the <br />optimum system supplies plus the estimated excess supplies available for <br />transbasin diversion. <br /> <br />PRODUCTS: <br /> <br />1. Location map of existing Overland Ditch and Reservoir system. <br /> <br />2. Tabulation" of present actual operating capacities of components of existing <br />system. <br /> <br />3. List of enlargements and improvements of components of the existing system <br />required to accommodate the estimated excess supplies available for trans- <br />basin diversion. <br /> <br />II-I 5 <br /> <br />Revised 9/23/1985 <br />